To install the new burner:
1. Install the new burner and gasket, tightening the screws evenly in a criss-cross pattern. Do
not over tighten; tighten by hand plus a ½ turn to maintain a good seal and prevent
deformation of the burner flange.
2. Reinstall the refractory, lining up the ignitor holes with the holes on the heat exchanger lid.
3. Turn over the burner-lid assembly, and install the ignitor gasket and ignitor (tightening its
screws by hand plus an extra 1/8 of a turn).
4. Reinstall the heat exchanger lid gasket. Ensure that the lid gasket is in good condition, and
is in place and level.
5. Reinstall the heat exchanger lid-burner assembly.
6. Replace the lid fasteners. Evenly tighten the bolts in a criss-cross pattern.
7. Reattach the ignitor wires.
8. Reinstall the fan gasket and fan, securing with the four nuts.
9. Reconnect the fan electrical wires.
10. Ensure that the gas valve O-ring is installed before reattaching the gas valve to the gas
valve connector
with the 4 bolts.
11. Reconnect the electrical wires (paired colors in correct orientation) to the gas valve.
12. Open up the gas supply valve, and check for leaks.
13. Tune the gas valve.
Figure 44
Order for tightening screws - SL 40-399 G3
88
Section: Service and maintenance
Summary of Contents for SL Series
Page 8: ...Intentionally left empty...
Page 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Page 14: ...Intentionally left empty...
Page 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Page 76: ...Intentionally left empty...
Page 96: ...Intentionally left empty...
Page 108: ...Intentionally left empty...
Page 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Page 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...