3.7.6 Sidewall vent termination
Caution
Vent termination clearances in this section are code minimum, or IBC-recommended
minimum requirements, and may be inadequate for your installation. Building envelope
details must be examined carefully. Take action to avoid moisture entering building
structures. Serious structural damage may occur if adequate precautions and
clearances are not considered. These precautions apply to neighboring structures as
well as to the structure the boiler(s) are installed in.
Vent terminal
Air supply inlet
Area where terminal is not permitted
Figure 15
Minimum clearances from vent/air inlet terminations
29
3.7.6 Sidewall vent termination
Summary of Contents for SL Series
Page 8: ...Intentionally left empty...
Page 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Page 14: ...Intentionally left empty...
Page 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Page 76: ...Intentionally left empty...
Page 96: ...Intentionally left empty...
Page 108: ...Intentionally left empty...
Page 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Page 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...