 Removing and replacing a node canister in the control enclosure

During installation, you might need to remove and replace the node canisters from the control enclosure.

About this task

• No tools are required to complete this task. Do not remove or loosen any screws.
• Use care when you remove a node canister from the enclosure. The node canister is long and its center of gravity is far forward. It can be

helpful to have a lift or other sturdy, flat surface ready to receive the node canister during removal.

CAUTION: 

 This part or unit is heavy but has a weight smaller than 18 kg (39.7 lb). Use care when lifting, removing, or installing

this part or unit. (C008)

Procedure
1.

To remove the node canister, locate the left and right release levers for the node canister.
On the upper node canister, the release levers are at the top of the control enclosure. On the bottom node canister, the release levers are

at the bottom of the enclosure. The serial number is on a label on the release lever; Step 

6

 on page 5 shows an example.

2.

Pull the left and right levers by the blue ends so that they both unlatch and swing outwards, as shown.

3.

Use the release levels to slowly pull the node canister and partially extract it from the enclosure.

Warning: 

 Observe safe handling practices as you complete the following steps. The node canister is long and heavy. Use a lifting

platform or other nearby surface to support the node canister as it is extracted from the control enclosure.

4.

Hold the node canister by its sides so that it is level and its weight is balanced. Then, slide the node canister out of the control enclosure.

5.

Place the node canister on a flat, level surface with its lid facing up.

Note: 

 The top node canister is inverted; after you remove the top node canister, you must turn it over.

6.

To replace the node canister, ensure that both of the canister release levers are in the open position.

7.

Push the node canister into the enclosure, ensuring that both release levers engage with the canister and close.

8.

Press the release levers closed to fully engage the node canister into the enclosure. Press the latch ends to ensure that the latches are

engaged with the control enclosure.

Summary of Contents for 2076-824

Page 1: ...you start the installation process ensure that the following items are available Philips screw driver Box knife Flat blade screw driver optional Three Ethernet cables The control enclosure and the fol...

Page 2: ...carefully cut along the lower fold line of the sides and remove them 7 Carefully cut the raised section of the foam packing away from the rear of the enclosure 8 Carefully cut open the bag that cover...

Page 3: ...the inside 2 of the rack cabinet 3 Close the front hinge bracket 3 to secure the rail to the rack cabinet flange 4 Extend the length of the side rail as needed 5 Close the hinge at the rear of the rai...

Page 4: ...continuing to power the enclosure if the other fails About this task You must follow recommended procedures for handling electrostatic discharge ESD sensitive devices No tools are required to complet...

Page 5: ...6 on page 5 shows an example 2 Pull the left and right levers by the blue ends so that they both unlatch and swing outwards as shown 3 Use the release levels to slowly pull the node canister and part...

Page 6: ...y for more than 10 minutes during servicing IBM FlashCore Modules are not interchangeable with the flash modules that are used in IBM FlashSystem 900 storage enclosures Procedure 1 To remove the drive...

Page 7: ...rst expansion enclosure 2 To add a second expansion enclosure chain to the control enclosure complete the following steps a Connect SAS port 3 of the top node canister in the control enclosure to SAS...

Page 8: ...guration node fails Connecting other networking cables Each control enclosure has three PCI slots that support the following types of optional networking adapters The Ethernet and FC networking adapte...

Page 9: ...em The system can contain 1 4 control enclosures If you are adding this control enclosure to an existing system go to Adding the control enclosure to an existing system on page 10 Otherwise continue t...

Page 10: ...pplication outside of the system If the two control enclosures lose communication with each other the quorum disk prevents both I O groups from going offline Installation worksheets Worksheets can hel...

Page 11: ...is bound to Ethernet port 2 Both IPv4 and IPv6 addresses can be used Specify the type of installation and the serial number S N of the control enclosure If you are installing a new system installatio...

Page 12: ...able to record the connections to the onboard Ethernet ports of each node canister in the control enclosure Control Enclosure S N Node Canister 1 Ethernet Port 4 Ethernet Port 3 Ethernet Port 2 Ethern...

Page 13: ...2 Port 5 Port 6 Port 7 Port 8 Port 9 Port 10 Switch Port Speed 25 or 10 Gbps Cable type Node IP Subnet mask Gateway VLAN ID Table 6 Ethernet adapter port connection worksheet Fibre Channel connection...

Page 14: ...tion number at the end of each caution notice or each danger notice In the following examples the numbers C001 and D002 are the identi cation numbers CAUTION A caution notice indicates the presence of...

Page 15: ...ons and to initiate menu actions that can also be done through mouse actions You can go to the system online documentation from the keyboard by using the keyboard shortcuts for your browser or screen...

Page 16: ...y IBM under terms of the IBM Customer Agreement IBM International Program License Agreement or any equivalent agreement between us The performance data discussed herein is presented as derived under s...

Page 17: ...elevision broadcasts Warning This equipment is compliant with Class A of CISPR 32 In a residential environment this equipment may cause radio interference Germany Notice Deutschsprachiger EU Hinweis H...

Page 18: ...er t erf llt die Schutzanforderungen nach EN 55024 und EN 55032 Klasse A Japan Electronics and Information Technology Industries Association JEITA Notice This statement applies to products less than o...

Page 19: ...erference in which case the user will be required to correct the interference at his own expense Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits...

Page 20: ...all subsequent modi cations until otherwise indicated in new editions Copyright International Business Machines Corporation 2020 US Government Users Restricted Rights Use duplication or disclosure res...

Reviews: