1
Bolts
2
Nut
3
Battery
retaining
bracket
d.
Grip
the
tab
on
the
front
of
the
battery
and
pull
the
battery
forward
until
it
can
be
accessed
by
two
service
representatives.
e.
With
the
assistance
of
another
service
representative,
lift
the
battery
assembly
clear
of
the
2145
UPS
and
place
to
one
side.
Note:
The
front
cover
for
the
2145
UPS
is
not
installed,
however,
it
is
included
inside
of
the
shipping
carton.
The
front
cover
is
installed
later
in
the
installation
process.
2.
With
the
assistance
of
another
service
representative,
lift
the
2145
UPS
clear
of
the
shipping
carton
and
place
it
on
a
flat,
stable
surface.
3.
Remove
the
two
screws
1
(shown
in
4.
Pull
the
electronics
assembly
2
out
of
the
2145
UPS,
and
put
it
to
one
side.
1
2
3
Figure
86.
Fastening
the
battery
retaining
bracket
Appendix
B.
SAN
Volume
Controller
2145-4F2
125
Summary of Contents for 2145UPS-1U
Page 2: ......
Page 8: ...vi IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 56: ...18 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 72: ...34 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 102: ...64 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 138: ...100 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 190: ...152 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 192: ...154 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 200: ...162 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 228: ...190 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 231: ......
Page 232: ...Part Number 31P1046 Printed in USA GC27 2132 01 1P P N 31P1046...