8.
Attach
only
the
bottom
hole
of
the
rail
to
the
front
of
the
rack
with
one
M6
×
10
screw
and
one
clip
nut
(
1
in
9.
Install
a
clip
nut
in
the
top
hole
of
the
rail
3
.
10.
Repeat
step
through
step
for
the
other
rail.
11.
Tighten
the
assembly
wing
nuts
on
both
rail
assemblies.
Installing
the
2145
UPS-1U
in
the
rack
After
you
have
completed
the
preparation
procedures,
you
are
ready
to
install
the
2145
uninterruptible
power
supply-1U
(2145
UPS-1U)
in
the
rack.
Attention:
Read
all
safety
and
environmental
notices
before
you
start
the
installation
process.
Use
the
reference
numbers
in
parentheses
at
the
end
of
each
notice
to
find
the
matching
translated
notice.
For
the
translation
of
the
danger,
caution,
attention
notices,
and
the
translation
of
the
safety
labels,
see
the
IBM
Systems
Safety
Notices
.
1
2
svc00034
Figure
17.
Securing
the
rear
rail
on
the
2145
UPS-1U
svc00032
1
2
3
4
Figure
18.
Securing
the
front
rail
on
the
2145
UPS-1U
Chapter
6.
Installing
the
SAN
Volume
Controller
2145-8G4
hardware
43
Summary of Contents for 2145UPS-1U
Page 2: ......
Page 8: ...vi IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 56: ...18 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 72: ...34 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 102: ...64 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 138: ...100 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 190: ...152 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 192: ...154 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 200: ...162 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 228: ...190 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 231: ......
Page 232: ...Part Number 31P1046 Printed in USA GC27 2132 01 1P P N 31P1046...