1
Rear
of
rail
2
Rack
mounting
rails
3
M6
screws
4
Latches
5
Front
of
rail
Note:
If
possible,
you
might
find
that
it
helps
to
remove
the
rack
doors
and
side
panels
to
provide
easier
access
during
installation.
2.
Check
the
labels
on
the
support
rails.
Each
rail
has
a
label
that
indicates
which
is
the
front
end
of
the
rail
and
whether
the
rail
is
for
the
left
or
right
side
of
the
rack.
Perform
this
procedure
for
both
rails.
3.
Insert
the
right
slide
rail
2
into
the
rear
rack
mounting
flange,
as
shown
in
with
the
rail
pins
1
protruding
through
the
flange.
4.
Extend
the
right
slide
rail
2
and
insert
it
into
the
front
rack
mounting
flange,
as
shown
in
with
the
rail
pins
1
protruding
through
Figure
26.
SAN
Volume
Controller
2145-8G4
support
rails
installation
kit
2
svc00240
Figure
27.
Inserting
the
right
slide
rail
into
the
rear
rack
mounting
flange
50
IBM
System
Storage
SAN
Volume
Controller:
Hardware
Installation
Guide
|
|
Summary of Contents for 2145UPS-1U
Page 2: ......
Page 8: ...vi IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 56: ...18 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 72: ...34 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 102: ...64 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 138: ...100 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 190: ...152 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 192: ...154 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 200: ...162 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 228: ...190 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 231: ......
Page 232: ...Part Number 31P1046 Printed in USA GC27 2132 01 1P P N 31P1046...