10
(Rack- or Surface-Mounting)
✹
✹
✹
✹
✹
✹
✹
✹
✹
✹
A
B
1
5
2
6
3
7
4
8
1. Connect the power cords to the IBM 2216
and the power outlets. Switch on each
power supply. After 5 minutes, verify that
the correct LEDs are on. (See “LED
Status” on page 9.)
2. Ensure that the
Hardware Configuration
Quick Reference card is completed and
placed in the area provided under the IBM
2216 on the left.
11
Complete the Setup (Rack or Surface)
1. Connect the cables.
2. Label the IBM 2216 with its unique unit
number or name on the top right of the
front panel.
3. Report the phone number of the modem to
the network administrator and return all the
charts. The IBM 2216 is ready to be
configured.
5
Summary of Contents for 2216
Page 1: ...2216 Nways Multiaccess Connector Hardware Installation Guide GA27 4106 00...
Page 2: ......
Page 3: ...2216 Nways Multiaccess Connector Hardware Installation Guide GA27 4106 00...
Page 6: ...iv 2216 Hardware Installation Guide...
Page 12: ...6 2216 Hardware Installation Guide...
Page 14: ...8 2216 Hardware Installation Guide...
Page 16: ...10 2216 Hardware Installation Guide...
Page 24: ...18 2216 Hardware Installation Guide...
Page 26: ...20 2216 Hardware Installation Guide...
Page 27: ......
Page 28: ...Part Number 38H7825 Printed in U S A 38H7825 GA27 4106 00...