Figure 60. Installing the display panel assembly
3. Insert the display panel assembly until it clicks into position.
4. Replace the top cover, as described in “Installing or replacing the top cover” on page 28.
5. Ensure the LEDs on the display panel are lit correctly. See “5U92 disk enclosure LEDs and indicators”
on page 45 for details.
Installing or replacing an expansion canister
You can reinstall an expansion canister in a 5U92 disk enclosure or replace a faulty expansion canister
with one from FRU stock.
Before you begin
Important: You can replace an expansion canister without powering off the expansion enclosure.
However, to maintain operating temperature, replace the expansion canister within 10 minutes of its
removal. When an expansion canister is removed, the reduction in airflow through the enclosure might
cause the enclosure or its components to shut down to protect from overheating.
About this task
An expansion canister provides SAS connectivity between the 5U92 disk enclosure and the system. The
expansion enclosure contains two expansion canisters. Figure 61 on page 62 shows an example of an
expansion canister. If either of the two expansion canisters has a failure, the other expansion canister
assumes the full I/O load.
Figure 61. Expansion canister
1
Canister fault indicator
2
Canister status
3
Canister power indicator
4
and
6
SAS link fault indicators
5
and
7
SAS link operational indicators
8
Canister release handles
62 IBM Cloud Object Storage System
™
Version 3.15.6: J15 Appliance Manual
Summary of Contents for 5U92
Page 1: ...IBM Cloud Object Storage System Version 3 15 6 J15 Appliance Manual IBM...
Page 10: ...x...
Page 12: ...xii...
Page 24: ...xxiv IBM Cloud Object Storage System Version 3 15 6 J15 Appliance Manual...
Page 32: ...4 IBM Cloud Object Storage System Version 3 15 6 J15 Appliance Manual...
Page 140: ...112 IBM Cloud Object Storage System Version 3 15 6 J15 Appliance Manual...
Page 141: ......