Copyright IBM Corp. 1997
2-1
Chapter 2. Installing the 8237
Before installing the IBM 8237 Stackable Ethernet Hub 10BASE-T, be sure to read
"Safety Information" on page ix, the information in "Notices" on page C-2, and
"Electronic Emission Notices" on page C-3.
This chapter provides step-by-step instructions for installing the 8237. It also
explains how to install the optional Expansion Ports.
Before You Begin
1
Examine the contents of the package.
Along with this manual, the 8237 package should contain:
•
The 8237 with mounting brackets attached
•
A cable management bracket
•
A power cord
•
A safety manual
•
A Stack Link cable
If any item is missing or damaged, contact your place of purchase.
2
Gather the other materials you will need:
•
Network documentation identifying devices and specifying port
connections
•
And, if you will be rack-mounting the 8237
- Four rack-mounting screws that are appropriate for your rack
- A screwdriver that is appropriate for your rack-mounting screws
Setup
Refer to your network documentation for instructions about whether to rack-mount or
surface-mount the 8237.
Rack-Mounting the 8237
1
Using a screwdriver, remove the four screws (two on each side) that attach
the mounting brackets to the sides of the 8237, as shown in Figure 2-1 on
page 2-2.
2
Rotate the brackets and reattach them as shown in Figure 2-1 on page 2-2.
Summary of Contents for 8237
Page 1: ......
Page 2: ......
Page 7: ...vi 8237 Hub Installation and Planning Guide...
Page 15: ...xiv 8237 Hub Installation and Planning Guide...
Page 41: ...2 8 8237 Hub Installation and Planning Guide...
Page 91: ...3 50 8237 Hub Installation and Planning Guide...
Page 109: ...4 18 8237 Hub Installation and Planning Guide Figure 4 20 8237 Field Replaceable Parts...
Page 113: ...4 22 8237 Hub Installation and Planning Guide...
Page 117: ...A 4 8237 Hub Installation and Planning Guide...
Page 147: ...B 30 8237 Hub Installation and Planning Guide...
Page 166: ...Part Number 85H8847 Printed in Taiwan 85H8847 GA27 4186 00...