52
IBM 8265: Planning and Site Preparation Guide
ATM 155Mbps
This section details the supported cables and maximum allowable distances for
attaching 155Mbps ATM devices. These devices follow the cabling rules established
in EIA/TIA-568
Commercial Building Telecommunications Cabling Standard
and
ISO/IEC DIS 11801, for horizontal cabling Class D.
Using Patch Cables
Patch cables are often used in the twisted pair link between ATM devices.
Installations using patch cables to connect devices to the main trunk cable must
reduce the maximum cable distances given in Table 33 and Table 34 to ensure
reliable operation.
UTP/FTP Category 3, 4, and 5 patch cables assembled from patch cord and
connectors of the same category that meet the U.S. or Canadian standards should not
exceed 80 percent of the distances in Table 33 and Table 34. For countries where
cabling is manufactured according to the less stringent ISO standard, the maximum
distances for such assemblies should be no more than 50 percent of the distances.
Installations using 150-ohm STP patch cables (IBM Type 6) should not exceed 70
percent of the maximum allowable distance using STP Type 1 cable.
For example, the 155Mbps link using patch cables will have a maximum link distance
of 105 m (150 x 70%). This allows a main trunk of 95 m when using two patch cables
of 5 m each.
Generally, it is not good practice to build networks with patch cables that even
approach these maximum distances, because the cable is often unprotected and
exposed to physical damage that might affect transmission performance.
Table 34. Maximum Link Distance over ATM (155Mbps)
Cable Type
Maximum Allowable Distance
100 ohm UTP Category 5
100 m (330 ft)
120 ohm FTP
100 m (330 ft)
150 ohm STP Type 1
150 m (493 ft)
Summary of Contents for 8265
Page 1: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 0 IBM...
Page 2: ......
Page 3: ...8265 Nways ATM Switch Planning and Site Preparation Guide GA33 0460 01 IBM...
Page 8: ...vi IBM 8265 Planning and Site Preparation Guide...
Page 10: ...viii IBM 8265 Planning and Site Preparation Guide...
Page 14: ...xii IBM 8265 Planning and Site Preparation Guide...
Page 16: ...xiv IBM 8265 Planning and Site Preparation Guide...
Page 26: ...10 IBM 8265 Planning and Site Preparation Guide...
Page 38: ...22 IBM 8265 Planning and Site Preparation Guide...
Page 70: ...54 IBM 8265 Planning and Site Preparation Guide...
Page 118: ...102 IBM 8265 Planning and Site Preparation Guide...
Page 121: ...Copyright IBM Corp 1994 1998 105 Appendix C Blank Planning Charts...
Page 122: ...106 IBM 8265 Planning and Site Preparation Guide...
Page 123: ...Appendix C Blank Planning Charts 107...
Page 124: ...108 IBM 8265 Planning and Site Preparation Guide...
Page 126: ...110 IBM 8265 Planning and Site Preparation Guide...
Page 128: ...112 IBM 8265 Planning and Site Preparation Guide...
Page 130: ...114 IBM 8265 Planning and Site Preparation Guide...
Page 132: ...116 IBM 8265 Planning and Site Preparation Guide...
Page 134: ...118 IBM 8265 Planning and Site Preparation Guide...
Page 136: ...120 IBM 8265 Planning and Site Preparation Guide...
Page 138: ...122 IBM 8265 Planning and Site Preparation Guide...
Page 140: ...124 IBM 8265 Planning and Site Preparation Guide...
Page 142: ...126 IBM 8265 Planning and Site Preparation Guide...
Page 144: ...128 IBM 8265 Planning and Site Preparation Guide...
Page 146: ...130 IBM 8265 Planning and Site Preparation Guide...
Page 148: ...132 IBM 8265 Planning and Site Preparation Guide...
Page 152: ...136 IBM 8265 Planning and Site Preparation Guide...
Page 163: ......