Table 101. Electrical
1
(continued)
Electrical characteristics
Properties
Maximum thermal output
1126 BTU/hr
Input voltage (low range)
100 - 127 V ac
Input voltage (high range)
200 - 240 V ac
Frequency
50 or 60 Hz
1.
Power consumption and heat output vary depending on the number and type of optional features that are
installed and the power-management optional features that are in use.
Table 102. Environmental requirements
Environment
Allowable operating
Nonoperating
(system off)
Nonoperating
(storage)
Nonoperating
(shipping)
ASHRAE class
A3
Airflow direction
Front-to-back
Temperature
5°C - 40°C (41°F -
104°F) at 0 - 950 m (0
- 3117 ft)
Decrease maximum
system temperature
by 1°C for every 175
m (574 ft) above 950
m (3117 ft).
5°C - 28°C (41°F -
82°F) at 3050 m
(10000 ft)
5°C - 45°C (41°F -
113°F)
1°C - 60°C (33.8°F -
140.0°F)
-40°C to 60°C (-40°F
to 140°F)
Humidity range
Non-condensing:
-12.0°C (10.4°F) dew
point
Relative humidity
(RH): 8% - 85%
8% - 85% RH
5% to 80% RH
5% - 100% RH
Maximum dew point
24°C (75°F)
27°C (80.6°F)
29°C (84.2°F)
29°C (84.2°F)
Maximum altitude
3050 m (10000 ft)
3050 m (10000 ft)
3050 m (10000 ft)
10700 m (35105 ft)
Table 103. Noise emissions (Maximum configuration)
1
Acoustical characteristics
Idling
Operating
L
WAd
6.2 bels
6.5 bels
1.
The noise emission level that is stated is the declared (upper limit) sound power level, in bels, for a random
sample of servers. All measurements are made in accordance with ISO 7779 and reported in conformance with
ISO 9296.
7042-CR9 Hardware Management Console specifications
Hardware specifications for model 7042-CR9 provide detailed information for your Hardware
Management Console (HMC), including dimensions, electrical, power, temperature, environmental
specifications, and noise emissions.
The HMC controls managed systems, including the management of logical partitions and the use of
capacity on demand. Using service applications, the HMC communicates with managed systems to
80
Site and hardware planning
Summary of Contents for 8408-44E
Page 1: ...Power Systems Site and hardware planning IBM...
Page 2: ......
Page 3: ...Power Systems Site and hardware planning IBM...
Page 16: ...xiv Site and hardware planning...
Page 18: ...2 Site and hardware planning...
Page 22: ...6 Site and hardware planning...
Page 51: ...Figure 19 Model 0555 and 7014 S25 plan view Site and hardware planning 35...
Page 192: ...176 Site and hardware planning...
Page 204: ...188 Site and hardware planning...
Page 205: ......
Page 206: ...IBM Printed in USA...