Note:
For
the
On
site
relocation,
rack
on
casters,
column
the
maximum
number
of
BladeCenter
units
(including
the
PDUs
to
support
the
configuration)
is
based
on
a
14–degree
stability
requirement
established
under
IBM
safety
guidelines.
Table
4.
IBM
NetBAY
rack
weight
load
limits
Rack
Rack
weight
Maximum
allowable
rack
weight
load
Maximum
fully
loaded
BladeCenter
units
with
rack
on
leveling
pads
On
site
relocation,
rack
on
casters,
maximum
number
of
BladeCenter
units
Shipping
on
pallet,
maximum
number
of
BladeCenter
units
NetBAY
42
Enterprise
Rack
261
kg
(575
lb)
932
kg
(2050
lb)
6
3
3
NetBAY
42
Enterprise
Expansion
Cabinet
235
kg
(516
lb)
932
kg
(2050
lb)
6
3
3
NetBAY
42
Standard
Rack
137
kg
(301
lb)
909
kg
(2000
lb)
6
3
0
NetBAY
42
Standard
Expansion
Cabinet
105
kg
(231
lb)
909
kg
(2000
lb)
6
3
0
NetBAY
25
Standard
Rack
94
kg
(207
lb)
568
kg
(1250
lb)
3
3
3
NetBAY
11
Standard
Rack
34
kg
(75
lb)
185
kg
(407
lb)
1
1
1
When
determining
your
floor
load
limits,
use
the
combined
weight
of
the
rack,
populated
BladeCenter
units,
power
distribution
units
and
other
rack
mounting
hardware
to
ensure
the
installation
site
can
safely
support
the
total
weight.
Consult
your
local
building
engineer
to
understand
the
weight
limits
at
your
site.
Worksheets
are
provided
in
Appendix
A,
“Planning
worksheets,”
on
page
85.
Moving
IBM
NetBAY
racks
safely
It
is
very
important
to
ensure
that
you
move
racks
safely.
For
42U
racks,
all
equipment
installed
above
22U
in
the
rack
must
be
removed
before
a
rack
can
be
moved
to
another
location.
Before
moving
a
rack,
be
sure
to
carefully
read
the
instructions
that
are
provided
with
your
rack.
Using
non-IBM
racks
If
you
intend
to
install
BladeCenter
units
in
a
rack
other
than
an
IBM
NetBAY
rack,
verify
that
the
rack
meets
these
requirements:
v
The
rack
mounting
flanges
has
holes
and
clearances
per
EIA-310-D
v
Rack
with
a
front
to
rear
spacing
of
698.50
mm
(27.5
in)
to
723.90
mm
(28.5
in)
44
BladeCenter
Type
8677:
Planning
and
Installation
Guide
Summary of Contents for 8677 - BladeCenter Rack-mountable - Power...
Page 1: ...BladeCenter Type 8677 Planning and Installation Guide GA27 4327 01 ERserver...
Page 2: ......
Page 3: ...BladeCenter Type 8677 Planning and Installation Guide GA27 4327 01 ERserver...
Page 6: ...iv BladeCenter Type 8677 Planning and Installation Guide...
Page 10: ...viii BladeCenter Type 8677 Planning and Installation Guide...
Page 94: ...84 BladeCenter Type 8677 Planning and Installation Guide...
Page 122: ...112 BladeCenter Type 8677 Planning and Installation Guide...
Page 125: ......
Page 126: ...Printed in USA GA27 4327 01...