Connecting the power cords to the 9008-22L, 9009-22A, or 9223-22H
system
Use this procedure to connect the power cords to the IBM Power System L922 (9008-22L), IBM Power
System S922 (9009-22A), or IBM Power System H922 (9223-22H) server.
Procedure
1.
If applicable, open the rack door at the rear of the system unit that you are servicing.
2.
Using your labels, reconnect the power cords (A) to the system unit. Fasten the power cords to the
system using the hook-and-loop fasteners (B) as shown in Figure 37.
3.
Close the rack door at the rear of the system.
Installing or replacing a part by using an HMC
You can use the Hardware Management Console (HMC) to perform many service actions, including the
installation of a new field-replaceable unit (FRU) or parts.
Installing a part by using the HMC
You can use the Hardware Management Console (HMC) to perform many service actions, including the
installation of a new feature or part.
Procedure
1.
In the navigation area, click the Resources icon
, and then click All Systems.
2.
Click the system name for which you want to install the part.
Figure 37. Connecting the power cords
50
Power Systems: System processor modules for the 9008-22L, 9009-22A, or 9223-22H
Summary of Contents for 9008-22L
Page 1: ...Power Systems System processor modules for the 9008 22L 9009 22A or 9223 22H IBM...
Page 2: ......
Page 3: ...Power Systems System processor modules for the 9008 22L 9009 22A or 9223 22H IBM...
Page 16: ...xiv Power Systems System processor modules for the 9008 22L 9009 22A or 9223 22H...
Page 108: ...92 Power Systems System processor modules for the 9008 22L 9009 22A or 9223 22H...
Page 109: ......
Page 110: ...IBM...