Figure 76. Reconnecting the signal cable and the power cable
3. Replace the air baffles. For instructions, see Replacing the air baffle (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_922_airbafflereplace.htm).
Preparing the 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H, or 9223-22S
system for operation after removing and replacing the drive backplane signal cable
To prepare the system for operation after removing and replacing a drive backplane signal cable,
complete the steps in this procedure.
Procedure
1. Slide the service access cover (A) onto the system unit.
2. Close the release latch (B) by pushing it in the direction shown.
88 Power Systems: Power Systems: Drive backplane
Summary of Contents for 9009-22A
Page 4: ...iv...
Page 14: ...xiv Power Systems Power Systems Drive backplane...
Page 16: ...Figure 1 Removing the power cords L003 or or 2 Power Systems Power Systems Drive backplane...
Page 80: ...66 Power Systems Power Systems Drive backplane...
Page 82: ...Figure 61 Removing the power cords L003 or or 68 Power Systems Power Systems Drive backplane...
Page 94: ...Figure 70 Removing the power cords L003 or or 80 Power Systems Power Systems Drive backplane...
Page 115: ......
Page 116: ...IBM...