Prerequisite Before some FRU Exchanging
1
Ask the customer to stop the traffic on all the Multiaccess Enclosure.
2
On the Service Processor select the 3746/9x0 Menu.
3
Click on the Multiaccess Enclosure (MAE) Management.
4
Double click on the Perform Maintenance on MAE.
5
The following window is displayed:
Click on Yes.
6
The following window is displayed:
Click on OK.
7
You should first received an alarm message saying: "MAE Concurrent
Maintenance in Progress".
8
Click on OK.
9
In the following table, find the FRU you want to exchange and go to the
procedure indicated.
Note: Be aware that the MAE will be restarted automatically after 40 minutes.
4-2
3746-9X0: MAE Installation and Maintenance
Summary of Contents for 950
Page 2: ......
Page 12: ...x 3746 9X0 MAE Installation and Maintenance ...
Page 22: ...xx 3746 9X0 MAE Installation and Maintenance ...
Page 28: ...xxvi 3746 9X0 MAE Installation and Maintenance ...
Page 48: ...Go to Step 6 Customizing the MAE on page 1 21 1 20 3746 9X0 MAE Installation and Maintenance ...
Page 176: ...4 58 3746 9X0 MAE Installation and Maintenance ...
Page 184: ...Figure 5 4 Current Boot Sequence 5 8 3746 9X0 MAE Installation and Maintenance ...
Page 243: ...Installing Options Programming None Chapter 6 Installing Options 6 7 ...
Page 254: ...Installing Options 6 18 3746 9X0 MAE Installation and Maintenance ...
Page 258: ...Installing Options 7 4 3746 9X0 MAE Installation and Maintenance ...
Page 264: ...B 4 3746 9X0 MAE Installation and Maintenance ...
Page 266: ...C 2 3746 9X0 MAE Installation and Maintenance ...
Page 278: ...D 12 3746 9X0 MAE Installation and Maintenance ...
Page 294: ...E 16 3746 9X0 MAE Installation and Maintenance ...
Page 300: ...F 6 3746 9X0 MAE Installation and Maintenance ...
Page 302: ...G 2 3746 9X0 MAE Installation and Maintenance ...
Page 306: ...H 4 3746 9X0 MAE Installation and Maintenance ...
Page 382: ...X 6 3746 9X0 MAE Installation and Maintenance ...
Page 389: ......