background image

IBM 8260 Nways Multiprotocol Switching Hub

Installation Instructions

for

ATM Control Point Version 3.1.9

PNNI

Ž

 

   Installation  Instructions 

                                                                                                                                                             
          
          

             Copyright   IBM Corp. 1998

Page 1

June 17  1998

EC : F34705

PN : 26L0227

Summary of Contents for ATM Control Point 3.1.9

Page 1: ...IBM 8260 Nways Multiprotocol Switching Hub Installation Instructions for ATM Control Point Version 3 1 9 PNNI Installation Instructions Copyright IBM Corp 1998 Page 1 June 17 1998 EC F34705 PN 26L0227...

Page 2: ...t microcode 10 2 3 Step 3 Download Inband the 8260 A CPSW FPGA picocode 10 2 2 Step 2 Download Inband the 8260 A CPSW operational microcode 9 2 1 Step 1 Saving Configuration before the upgrade 9 2 Upg...

Page 3: ...ocode boot microcode No redundant CPSW or both CPSW are downloaded Swap FPGA picocode Swap microcode Noredundant CPSW or Make redundant No Yes Yes No step 6 step 8 step 5 step 2 step 3 step 4 step 1 d...

Page 4: ...y of this installation instructions II60V319 ps A soft copy of the release note RN60V319 PS 2 The diskette Part Number 26L0256 contains A new MIB version 2 1 8260V21 MIB A CPSW operational microcode 8...

Page 5: ...diskette part number 26L0256 in the workstation 5 Copy from the diskette to the directory where you want the microcodes to reside the following files A CPSW operational microcode file name 8260V319 O...

Page 6: ...y that the following parameters are configured ATM address of the ARP server IP address and IP mask of the A CPSW IP address of the default gateway 3 Verify the IP connectivity to the ARP server by en...

Page 7: ...Out of Band Download method FPGA picocode cannot be downloaded using this method only boot and operational Download can only be performed on active CPSW Once you have the code on your A disk or hard...

Page 8: ...PSW follow the steps 1 to 5 for main A CPSW and the steps 2 to 4 then 6 for redundant A CPSW Then follow the steps 6 7 and 8 on main A CPSW see upgrade synopsis 2 1 Step 1 Saving Configuration before...

Page 9: ...edure by entering DOWNLOAD INBAND When prompted type Y to confirm 4 Wait for successful termination of the download operation The message Download successful is displayed This may also be checked by d...

Page 10: ...W TFTP The command SHOW MODULE n VERBOSE n 9 or 11 depending on A CPSW active position displays the FPGA level in backup It should appear as B52 2 4 Step 4 Download Inband the 8260 A CPSW boot microco...

Page 11: ...fter an A CPSW reset It should display v 3 1 9 If you have only one A CPSW module go to step 6 If you were upgrading your backup A CPSW module go to step 6 2 5 Step 5 Make the backup A CPSW active If...

Page 12: ...undant A CPSW go to step 7 If you had already swapped new FPGA picocode and microcode on both A CPSW modules go to step 7 Check the new levels of codes The following table lists the microcode and FPGA...

Page 13: ...any swap record your network parameters for LOGICAL LINK STATIC ROUTE ATM ADDRESS and VPC record those information on a sheet of paper Example for CLUSTER 1 1 HUBb SHOW LOGICAL_LINK ALL will display P...

Page 14: ...re 2 represents a network configured with 8260 8285 at the ATM firmware kit level MES5099 In this example there are two subnetworks X and Y three clusters and four hubs using UNI SSI NNI links You sho...

Page 15: ...99 99 99 99 99 0 9 77 77 Subnetwork Y ATM address 39 99 99 99 99 99 99 0 0 88 88 NNI vpi0 Cluster 3 ACN 3 WS 3 4 3 6 1 HUB d HN 1 Figure 2 Example of a network at the ATM firware kit level MES 5099 W...

Page 16: ...3 Figure 3 represents your network after migration to PNNI phase 1 v 3 1 0 You can note that CLUSTER changes to PEER GROUP SSI changes to PNNI NNI changes to IISP Installation Instructions Copyright...

Page 17: ...ss 39 99 99 99 99 99 0 9 77 77 Subnetwork Y ATM address 39 99 99 99 99 99 99 0 0 88 88 WS 3 4 3 6 1 HUB d HN 1 Figure 3 Example of a network in level PNNI phase 1 v 3 1 0 WS 2 WS 1 UNI 3 1 4 1 5 1 3 2...

Page 18: ...01 01 o HUBa SHOW FUTURE_PNNI NODE_0 Check your new ATM address o HUBa COMMIT PNNI the 8260 will be reset The telnet session if any is broken Login as ADMINISTRATOR on the 8260 console o HUBa SHOW PNN...

Page 19: ...in as ADMINISTRATOR on the 8260 console o HUBb SHOW PNNI NODE_0 Check your ATM address It will display information about LEVEL ID PEERGROUP ID NODE ID PORT SETTING After having completed the swap the...

Page 20: ...REACHABLE ADDRESS SETTING After having completed the swap you lose your STATIC ROUTES and LOGICAL LINKS o Define the reachable address over the IISP link with your old static route and your old VPI ex...

Page 21: ...telnet session if any is broken Login as ADMINISTRATOR on the 8260 console o HUBc SHOW PNNI NODE_0 Check your ATM address It will display information about LEVEL ID PEERGROUP ID NODE ID PORT SETTING...

Page 22: ...fter having completed the swap you lose your STATIC ROUTES and LOGICAL LINKS o Define the reachable address over the IISP link with your old static route and your old VPI example to set up reachabilit...

Page 23: ...MIT PNNI the 8260 will be reset The telnet session if any is broken Login as ADMINISTRATOR on the 8260 console o HUBd SHOW PNNI NODE_0 Check your ATM address It will display information about LEVEL ID...

Page 24: ...Instructions Copyright IBM Corp 1998 Page 24 June 17 1998 EC F34705 PN 26L0227 After having completed the swap you lose your STATIC ROUTES and LOGICAL LINKS o Define the reachable address over the II...

Page 25: ...N UPDATE Insert the companion Release Note Part number 26L0228 EC level F34705 in your publications binder END OF DOCUMENT Installation Instructions Copyright IBM Corp 1998 Page 25 June 17 1998 EC F34...

Reviews: