Installation
requirements
You
will
need
the
following
tools
to
install
the
PDU
in
a
rack
cabinet:
v
One
Phillips
screwdriver
v
One
10
mm
(11/32-in.)
wrench
v
One
cage-nut-insertion
tool
or
flat-blade
screwdriver
(for
installing
cage
nuts
in
some
rack
cabinets)
You
can
install
a
PDU
vertically
in
the
side
of
a
rack
cabinet
or
horizontally
within
1
U
1
of
EIA
mounting
space
in
a
rack
cabinet.
v
For
horizontal
mounting
instructions,
see
the
rack-mounting
document
that
comes
with
the
PDU.
Attention:
Horizontal
installation
of
the
PDU
is
not
supported
during
relocation
or
shipping
of
a
rack
cabinet.
Before
you
relocate
the
rack
cabinet,
you
must
remove
any
horizontally
mounted
PDU
from
the
EIA
mounting
space.
v
For
vertical
mounting
instructions,
see
Parts
that
come
with
the
PDU
Note:
The
illustrations
in
this
document
might
differ
slightly
from
your
hardware.
The
following
parts
come
with
the
PDU:
v
One
PDU
(some
models
include
detached
line
cords)
LA
N
3
4
1
2
5
6
v
Two
vertical-mounting
brackets
(for
all
rack
cabinets)
1. One
U
is
equal
to
4.45
cm
(1.75
in.)
Chapter
1.
Introduction
3
Summary of Contents for DPI C13 PDU+
Page 1: ...DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 2: ......
Page 3: ...DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 20: ...8 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 28: ...16 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 48: ...36 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 54: ...42 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 58: ...46 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 87: ......
Page 88: ...Part Number 40K9635 Printed in USA 1P P N 40K9635...