8.
Route
all
the
other
power
cables
neatly,
using
the
cable-management
bracket
if
it
is
installed,
and
secure
the
power
cables
with
cable
straps.
Note:
To
route
a
power
cable
through
the
cable-management
bracket,
route
the
cable
through
an
opening
in
the
bracket
and
against
an
upper
or
lower
tab
on
the
bracket,
as
shown
in
the
following
illustration.
Use
cable
straps
as
required.
Tab
Installing
the
PDU
in
the
side
of
an
IBM
Enterprise
rack
cabinet
only
Note:
Removing
the
rack
doors
and
side
panels
might
make
installation
easier.
See
the
rack
cabinet
documentation
for
more
information.
Review
the
documentation
that
comes
with
your
rack
cabinet
for
safety
and
cabling
information.
When
installing
your
system
in
a
rack
cabinet,
consider
the
following:
v
Make
sure
that
the
room
air
temperature
is
below
35°C
(95°F).
v
Do
not
block
any
air
vents,
usually
15
cm
(6
in.)
of
air
space
provides
proper
airflow.
v
Connect
all
power
cords
to
properly
wired
and
grounded
electrical
outlets.
v
Do
not
overload
the
power
outlet
when
installing
multiple
devices
in
the
rack.
12
DPI
C13
PDU+,
DPI
C19
PDU+,
and
DPI
C19
3-phase
PDU+:
Installation
and
Maintenance
Guide
Summary of Contents for DPI C13 PDU+
Page 1: ...DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 2: ......
Page 3: ...DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 20: ...8 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 28: ...16 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 48: ...36 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 54: ...42 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 58: ...46 DPI C13 PDU DPI C19 PDU and DPI C19 3 phase PDU Installation and Maintenance Guide...
Page 87: ......
Page 88: ...Part Number 40K9635 Printed in USA 1P P N 40K9635...