38
IBM® xSeries 150: Installation Guide
P/N 19K0804
Printed in the U.S.A.
®
8
7
A
A
A
A
B
B
Press in on the safety latches and slide the
server halfway into the rack. Attach the power,
keyboard, mouse, and monitor cables
(if required) to the server and route them
through the cable restraint bracket . Then,
attach all other required cables to the server.
Refer to your server documentation to complete the installation.
Store these instructions in the binder that comes with your server.
Route all the cables through the cable-
management assembly as shown. Then, use
the cable straps or the cable ties to secure
the cables to the cable-management assembly
9
A
B
A
B
B
Slide the server into the rack until the release
latches snap shut. Then, insert the M6 screws
through the release-latch-bracket assembly.
Inserting the M6 screws is optional, unless
you are moving the rack or the rack is in a
vibration-prone area.
Note:
Summary of Contents for eServer 150 xSeries
Page 1: ...IBM IBM xSeries 150 Installation Guide...
Page 2: ......
Page 3: ...IBM IBM xSeries 150 Installation Guide...
Page 10: ...viii IBM xSeries 150 Installation Guide...
Page 12: ...x IBM xSeries 150 Installation Guide...
Page 16: ...4 IBM xSeries 150 Installation Guide...
Page 24: ...12 IBM xSeries 150 Installation Guide...
Page 36: ...24 IBM xSeries 150 Installation Guide...
Page 40: ...28 IBM xSeries 150 Installation Guide...
Page 74: ...62 IBM xSeries 150 Installation Guide...
Page 75: ......