18
IBM xSeries 232: Installation Guide
To install a hot-swap power supply:
1.
Make sure the server has the power supply backplane option installed.
2.
Remove the filler panel from the empty power supply bay.
Note:
During typical operation, each power-supply bay must have either a power
supply or filler panel installed for proper cooling.
3.
Install the power supply in the bay:
4.
Plug the power cord for the added power supply into the power cord connector.
5.
Route the power cord through the cable-restraint bracket.
6.
Plug the power cord into a properly grounded electrical outlet.
7.
Verify that the dc power light and ac power light on the power supply are lit,
indicating that the power supply is operating correctly.
8.
If you have other options to install, install them now.
9.
If you removed the server cover, reinstall it.
10. Continue with “Cabling the server” on page 19.
Filler panel
Cable-restraint
bracket
Power supply
backplane option
Power supply
Power supply handle
(in open position)