Completing the installation
To complete your installation, you must reinstall the cover and reconnect all the
cables that you disconnected in “Preparing to install options” on page 46, and, for
certain options, run the Configuration/Setup Utility program. Follow the instructions
in this section.
If you have a tower model, continue with “Completing the tower model
installation.”
If you have a rack model, go to “Completing the rack model installation” on
page 88.
Completing the tower model installation
To complete the installation for the tower model:
1. Install the left-side cover, if it was removed.
CPU
VR
M
ME
MOR
Y
HD
D
PCI
B
US
NM
I
SM
I
SER
VIC
E PR
OC
ESS
OR
BU
S
NO
N
RE
DU
ND
ANT
PO
W
ER
S
UPP
LY
1 2
3
A B
1 2
3
FA
N
TE
MP
ERA
TU
RE
1
Slots
2
Left-side cover
a. Align the left-side cover
2
with the left side of the server, about 25 mm
(1 inch) from the front of the server; place the bottom of the left-side cover
on the bottom rail of the left-side side of the chassis.
b. Insert the tabs at the top of the cover into the slots
1
at the top of the
server side.
c. Hold the cover against the server and slide the cover toward the front of
the server until the cover clicks into place.
Chapter 4. Installing options
85
Summary of Contents for eServer 240 xSeries
Page 1: ...User s Reference xSeries 240...
Page 26: ...16 IBM xSeries User s Reference...
Page 50: ...40 IBM xSeries User s Reference...
Page 116: ...106 IBM xSeries User s Reference...
Page 170: ...160 IBM xSeries User s Reference...
Page 180: ...170 IBM xSeries User s Reference...
Page 219: ...IBM Part Number 21P9014 Printed in the United States of America 21P9 14...