Attention:
To
help
ensure
proper
cooling
and
system
reliability
the
air
baffle
must
be
correctly
positioned
and
fully
seated.
4.
Make
sure
that
the
air
baffle
covering
microprocessor
1
and
microprocessor
4,
is
positioned
and
pushed
down
so
that
both
heat
sink
captive
mounting
screws
are
through
the
holes
in
the
air
baffle.
Air baffle
Microprocessor 1 and 4
heat sink captive mounting screws
5.
Lower
the
cover
so
that
the
slots
at
the
rear
slide
down
onto
the
cover
pins
at
the
rear
of
the
blade
server,
as
shown
in
the
illustration.
6.
Pivot
the
cover
to
the
closed
position
as
shown
in
the
illustration,
until
it
clicks
into
place.
Installing
the
blade
server
in
the
BladeCenter
unit
Note:
The
illustrations
used
in
this
procedure
depict
the
installation
process
on
a
BladeCenter
HS40
blade
server
in
a
BladeCenter
Type
8677
unit.
These
illustrations
might
differ
slightly
from
your
hardware.
However,
this
installation
process
is
the
same
regardless
of
the
BladeCenter
unit.
Blade server
Filler blade
Complete
the
following
steps
to
install
a
blade
server
in
the
BladeCenter
unit.
Chapter
3.
Installing
options
47
Summary of Contents for eServer BladeCenter HS40 Type 8839
Page 3: ...BladeCenter HS40 Type 8839 Installation and User s Guide ERserver ...
Page 8: ...vi BladeCenter HS40 Type 8839 Installation and User s Guide ...
Page 76: ...62 BladeCenter HS40 Type 8839 Installation and User s Guide ...
Page 90: ...76 BladeCenter HS40 Type 8839 Installation and User s Guide ...
Page 114: ...100 BladeCenter HS40 Type 8839 Installation and User s Guide ...
Page 118: ...104 BladeCenter HS40 Type 8839 Installation and User s Guide ...
Page 119: ......
Page 120: ... Part Number 90P3102 Printed in USA 1P P N 90P3102 ...