18
IBM Flex System FC5022 16Gb SAN Scalable Switch User’s Guide
Installing and removing an SFP+ transceiver
2
NOTE
A preferred order of cabling exists. Two of the 12-port licenses (port 0 and port 29) are factory
assigned. Use these ports first. Refer to
FIGURE 5
SFP+ transceiver installation
6. Connect the fiber-optic cable to the SFP+ transceiver. For information about protecting the
cable, refer to
“Handling an SFP+ transceiver”
7. Check the LEDs on the switch. When the switch is operating correctly, the green link LED is lit.
For information about the status of the switch LEDs, see
Removing an SFP+ transceiver
To remove an SFP+ transceiver, complete the following steps:
1. Read the safety information that begins on
“System reliability guidelines”
2. Read the information in
“Handling an SFP+ transceiver”
3. Remove the fiber-optic cable from the SFP+ module that you want to replace.
ATTENTION
To avoid damage to the cable or the SFP+ transceiver, make sure you disconnect the
fiber-optic cable
before
you remove the SFP+ module.
4. Unlock the SFP+ transceiver by gently pulling the tab straight out.
5. Place the SFP+ transceiver in a static-protective package.
6. Insert another SFP+ transceiver into the port (see
“Inserting an SFP+ transceiver”
or insert a dust cap, as shown in
.
1
Pull tab
2
SFP+ transceiver
1
2
Summary of Contents for FC5022
Page 1: ...IBM Flex System FC5022 16Gb SAN Scalable Switch User s Guide ...
Page 2: ......
Page 3: ...IBM Flex System FC5022 16Gb SAN Scalable Switch User s Guide ...
Page 8: ...vi IBM Flex System FC5022 16Gb SAN Scalable Switch User s Guide ...
Page 17: ...Introduction 3 Notices and statements 1 Notices and statements Notices for Network Device ...
Page 66: ...52 IBM Flex System FC5022 16Gb SAN Scalable Switch User s Guide Electronic emission notices B ...
Page 69: ......
Page 70: ...Part Number 88Y7924 Printed in USA IP P N 88Y7924 88Y7924 ...