Table
3-7 (Page 3 of 3). Model H70 Service Processor Checkpoints
Checkpoint
Description
Action/
Possible Failing FRU
E0E2
Check point for hot-swap fans and
power supply.
Power supply hot-swap is in
progress. Fans and power supply
must be replaced within 5 minutes.
After 5 minutes the service
processor initiates a fast shutdown
of the system.
OK
SP Ready Waiting for Power-On
None. Normal operation.
STBY
SP Ready; System was shutdown
by the operating system and is still
powered on.
This condition can be requested by
a privileged system user with no
faults. See service processor error
log for possible operating system
fault indications.
Chapter 3. Error Code to FRU Index
3-49
Summary of Contents for H SERIES RS/6000
Page 1: ...RS 6000 Enterprise Server Model H Series IBM Installation and Service Guide SA38 0547 01...
Page 14: ...xiv RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 34: ...1 18 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 106: ...2 72 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 178: ...3 72 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 262: ...7 14 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 279: ...Chapter 7 Removal and Replacement Procedures 7 31...
Page 315: ...Chapter 8 Parts Information Chapter 8 Parts Information 8 1...
Page 328: ...8 14 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 340: ...A 12 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 401: ...expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix E Modem Configurations E 21...
Page 408: ...E 28 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 412: ...F 4 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 419: ...Index X 7...
Page 420: ...X 8 RS 6000 Enterprise Server Model H Series Installation and Service Guide...
Page 423: ......