Installing System Cables to I/O 02 Expansion Frame
Determine if you have a I/O 02 Expansion Frame to install. A I/O 02 frame is populated with DASD only
at the front of the frame. If you do not have a I/O 02 Expansion Frame to install go to Chapter 2,
“Installing the I/O and Support Processor” on page 2-1
1 Power Signal Cables
1. Locate the Power Signal Cable
It will either be connected at LG16 of the CPC
or at the J04 positions on the OCAs of the I/O
02 frame.
Note:
There are 4 connections at LG16
location. From left to right the first is
connected to the CPC frame. The third
connection is the one you will use for
this step.
2. Route the cable from frame to frame.
3. Connect the free end of the cable to the
positions indicated above.
1-18
Installing the System
Summary of Contents for Multiprise 3000 S/390
Page 1: ...S 390 Multiprise 3000 Enterprise Server R IBM Installation Manual SY24 6154 03...
Page 2: ......
Page 3: ...S 390 IBM Installation Manual SY24 6154 03...
Page 8: ...vi Installing the System...
Page 14: ...xii Installing the System...
Page 34: ...1 20 Installing the System...
Page 40: ...2 6 Installing the System...
Page 78: ...5 20 Installing the System...
Page 156: ...6 78 Installing the System...
Page 160: ...7 4 Installing the System...
Page 172: ...B 4 Installing the System...
Page 173: ......
Page 175: ...Spine information IBM S 390 Installation Manual...