Chapter 2: Hardware Installation
23
*These screws may not be included in the slide rail box. If you do not find the 10-
32 screws in the slide rail box, please check for them in the CN1610 package kit.
Required tools and
equipment
Before installing the switch in a standard equipment rack or IBM N series 42U
System Cabinet, make sure you have the following equipment:
u
Number 2 Phillips screwdriver
u
Two standard rack screws
u
Electrostatic discharge (ESD) wrist strap
u
Cage nut installation tool
Description
Quantity
Support rails
2(left and right)
M5 screws
10
M5 nut-clips
10
10-32 screws
2*