Installing the support rails
To install the controller unit in a rack, use the rails and mounting hardware supplied with
your controller unit.
Where you place the support rails in or on the cabinet depends on where you intend to
position the controller unit.
Fan and Communications module (back view)
Loosen the captive screws; then, grasp the pull handle and
pull firmly to remove the module.
Power Supply (back view)
Using the pull handle, lift up and pull to
release each power supply; then, slide out
the power supply.
Mini-hubs (back view)
Loosen the captive screw; then, grasp the screw
and pull the mini-hub from the chassis.
Summary of Contents for Netfinity FAStT500
Page 1: ......
Page 2: ......
Page 3: ...Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide ...
Page 7: ...v Index 63 ...
Page 8: ...vi IBM Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide ...
Page 38: ...22 IBM Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide ...
Page 56: ...40 IBM Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide ...
Page 83: ... Part Number 19K0788 Printed in U S A April 2000 19K0788 ...