6
(Rack-Mounting)
With the second person’s help, set the IBM 2216 on
the IBM 2216 installation aid or on the shelf. The
mounting brackets keep the IBM 2216 from falling into
the rack during installation.
With the installation aid installed, one person can
steady the IBM 2216 while you complete the next step.
7
(Rack-Mounting)
1
3
2
4
Install the pairs of screws in the order shown.
8
(Rack-Mounting)
Reinstall the fan tray and each power supply, making
sure the screws are secured.
If the power supply resists, shift it to the left. If the fan
tray resists, gently rock it.
9
(Rack- or Surface-Mounting)
If you are installing a PCMCIA modem, slide it into
either of the PCMCIA slots on the system card. Attach
the telephone cable to the modem (a triangle identifies
the top of the cable).
1-4
2216 Installation and Initial Configuration Guide
Summary of Contents for Nways 2216
Page 1: ...2216 Nways Multiaccess Connector Installation and Initial Configuration Guide GA27 4106 01...
Page 2: ......
Page 3: ...2216 Nways Multiaccess Connector Installation and Initial Configuration Guide GA27 4106 01...
Page 6: ...iv 2216 Installation and Initial Configuration Guide...
Page 9: ...Common Tasks and the IBM 2216 Library About This Guide vii...
Page 14: ...xii 2216 Installation and Initial Configuration Guide...
Page 20: ...1 6 2216 Installation and Initial Configuration Guide...
Page 24: ...2 4 2216 Installation and Initial Configuration Guide...
Page 30: ...3 6 2216 Installation and Initial Configuration Guide...
Page 34: ...4 4 2216 Installation and Initial Configuration Guide...
Page 48: ...B 12 2216 Installation and Initial Configuration Guide...
Page 62: ......
Page 65: ......