Appendix A. Factory Plugging Defaults
Units assembled at the factory follow the plugging rules that are described in this
appendix.
Plugging Sequences
Table A-1 illustrates how the slots are numbered: two rows of four slots, numbered
1 through 8:
The following tables show the default sequence of installation for the various
adapters.
FC 2280 and FC 2281 are installed left to right, beginning with slot 1. A maximum
of six can be installed in any single IBM 2216.
Other adapters are installed right-to-left in the first-available slot beginning with slot
8 on the bottom and far right.
Table A-1. Slot Numbering
Slot 1
Slot 2
Slot 3
Slot 4
Slot 5
Slot 6
Slot 7
Slot 8
Table
A-2. FC 2280s (LIC 280s) and FC 2281s (LIC 281s)
1
3
5
2
4
6
Table
A-3. All Other Adapters
8
6
4
3
7
5
2
1
Copyright IBM Corp. 1997
A-1
Summary of Contents for Nways 2216
Page 1: ...2216 Nways Multiaccess Connector Installation and Initial Configuration Guide GA27 4106 01...
Page 2: ......
Page 3: ...2216 Nways Multiaccess Connector Installation and Initial Configuration Guide GA27 4106 01...
Page 6: ...iv 2216 Installation and Initial Configuration Guide...
Page 9: ...Common Tasks and the IBM 2216 Library About This Guide vii...
Page 14: ...xii 2216 Installation and Initial Configuration Guide...
Page 20: ...1 6 2216 Installation and Initial Configuration Guide...
Page 24: ...2 4 2216 Installation and Initial Configuration Guide...
Page 30: ...3 6 2216 Installation and Initial Configuration Guide...
Page 34: ...4 4 2216 Installation and Initial Configuration Guide...
Page 48: ...B 12 2216 Installation and Initial Configuration Guide...
Page 62: ......
Page 65: ......