Chapter 1. General description
35
1.5.4 IBM i 6.1
Before you install IBM i 6.1 on the 595 server, your system must meet the following minimum
requirements:
IBM i 6.1 (formerly known as i5/OS V6R1), or later
As with previous releases, 6.1 builds on top of the IBM i integrated capabilities with
enhancement primarily in the following areas:
IBM i security, including greatly expanded data encryption/decryption and network
intrusion detection
Support for the IBM PCI-X (#5749) and PCIe Fibre Channel (#5774) IOP-less adapters
and a new performance improved code path for attached IBM System Storage™
DS8000™ configurations
Expanded base save/restore, journaling and clustering support
New IBM high availability products that take advantage of the expanded 6.1 save/restore,
journaling and clustering support
System i PowerHA for i (formerly known as High Availability Solutions Manager (HASM))
and IBM iCluster for i
Logical partitioning extensions including support of multiple shared processor pools and
IBM i 6.1 as a client partition to another 6.1 server partition or a server IBM Virtual I/O
Server partition. The VIOS partition can be on a POWER6 server or a POWER6 IBM
Blade JS22 or JS12.
Expanded DB2 and SQL functions, graphical management of the database, and generally
improved performance
Integrated Web application server and Web Services server (for those getting started with
Web services
Integrated browser-based IBM Systems Director Navigator for i5/OS that includes a new
Investigate Performance Data graphically function
Initial release support of IBM Technology for Java 64-bit JVM
RPG COBOL, and C/C++ enhancements as well as new packaging of the application
development tools: the WebSphere® Development Studio and Rational® Developer suite
of tools
1.5.5 Linux for Power Systems summary
Linux is an open source operating system that runs on numerous platforms from embedded
systems to mainframe computers. It provides a UNIX-like implementation across many
computer architectures.
The supported versions of Linux for Power systems include the following brands to be run in
partitions:
Novell SUSE Linux Enterprise Server 10 Service Pack 2 for POWER, or later
Red Hat Enterprise Linux 4.7 for POWER, or later
Red Hat Enterprise Linux 5.2 for POWER, or later
Note:
IBM i 6.1 has a planned availability date of September 9, 2008.
Summary of Contents for Power 595
Page 2: ......
Page 120: ...108 IBM Power 595 Technical Overview and Introduction...
Page 182: ...170 IBM Power 595 Technical Overview and Introduction...
Page 186: ...174 IBM Power 595 Technical Overview and Introduction...
Page 187: ......