d) Close the cassette by pressing and sliding the release bar on the bottom of the cassette toward the
front.
e) Close the tailstock clamp by rotating the clamp to the left.
Review the following animation for a demonstration of how to install the adapter in the cassette.
5. Place the cassette with the adapter in it on an antistatic surface.
6. Repeat this procedure for each adapter that you removed.
Installing the system fans
You must install the system fans after you have placed the system onto the rails.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the fan.
a) Ensure that the fan latch is open.
b) Hold on to the fan latch and using your hand to support the bottom of the fan, push the fan into its
slot.
c) Slide the fan latch to the right to lock the fan into its slot.
d) Continue to push in against the latch with your thumb until the latch is fully seated.
Replacing the power supplies in the 9043-MRX system
To replace a power supply, complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the power supply.
a) Align the power supply with the bay and slide the power supply into the system until the latch locks
in place.
b) Use the hook-and-loop fastener and tie the power cord to the power supply handle.
3. Repeat this procedure for each power supply.
Cabling the server and connecting expansion units
Learn how to cable the server and to connect expansion units.
About this task
To cable the server and to connect expansion units, complete the following steps:
Procedure
1. Complete the following steps:
a. Plug the power cord into the power supply.
Note: If present, remove and discard any plug that covers the ports on the rear of the system.
The port covers ensure that you are reminded about resetting the Administrator password of your
managed system after the initial program load (IPL) completes.
b. Plug the system power cords and the power cords for any other attached devices into the power
source.
Installing the IBM Power E1050 (9043-MRX) 11
Summary of Contents for Power E1050
Page 1: ...Power Systems Installing the IBM Power E1050 9043 MRX IBM GI11 0003 00...
Page 4: ...iv...
Page 14: ...xiv Power Systems Installing the IBM Power E1050 9043 MRX...
Page 36: ...22 Power Systems Installing the IBM Power E1050 9043 MRX...
Page 47: ......
Page 48: ...IBM Part Number 03KG355 GI11 0003 00 1P P N 03KG355...