• The latest version of this document is maintained online, see Installing the IBM Power System AC922
(8335-GTC, 8335-GTG, and 8335-GTH) or IBM Power System AC922 (8335-GTW and 8335-GTX)
(http://www.ibm.com/support/knowledgecenter/POWER9/p8eik/p8eik_install_kickoff.htm).
• To plan your server installation, see Planning for the system (http://www.ibm.com/support/
knowledgecenter/POWER9/p9ia4/p9ia4_90x_kickoff.htm).
Procedure
Ensure that you have the following items before you start the installation:
• Phillips screwdriver
• Flat-head screwdriver
• Box cutter
• Electrostatic discharge (ESD) wrist strap
• Rack with two Electronic Industries Association (EIA) units (2U) of space
Completing inventory for your server
Use this information to complete inventory for your server.
Procedure
1. Verify that you received all the boxes you ordered.
2. Unpack the server components as needed.
3. Complete a parts inventory before you install each server component by following these steps:
a. Locate the inventory list for your server.
b. Ensure that you received all the parts that you ordered.
Note: Your order information is included with your product. You can also obtain the order
information from your marketing representative or the IBM Business Partner.
If you have incorrect, missing, or damaged parts, consult any of the following resources:
• Your IBM reseller.
• IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States
only).
• The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your
location to view the service and support contact information.
Removing the shipping bracket and connecting water hoses and power cords for your preinstalled
server
Before you set up a console, you must remove the shipping brackets and connect water hoses and power
cords.
About this task
To remove the shipping bracket and connect power cords, do the following:
Procedure
1. Remove the screws that secure the shipping brackets to the chassis.
2. Connect the water hoses at the rear of the rack to the manifold, as shown in the following figure.
Ensure that you plug the male hose into the female manifold plug, and plug the female hose into the
male manifold plug.
Attention: Before powering on the system, ensure that cooling water is circulating through the
system.
Installing and configuring the 8335-GTX 7
Summary of Contents for Power System 8335-GTX
Page 4: ...iv ...
Page 105: ...or or or or Installing and configuring the 8335 GTX 91 ...
Page 137: ......
Page 138: ...IBM ...