Fixed rails
Use this procedure when your system is installed using fixed rails.
Before you begin
CAUTION: This system requires two people to replace the system into the rack. Do not begin this
procedure unless physical assistance is available to replace the system into the rack.
Note: When you place the system into the operating position, you must ensure that all stability plates are
firmly installed to prevent the rack from toppling. Ensure that only one system unit is replaced at a time.
Procedure
1. Position one person on the left side of the system and one person on the right side of the system.
2. Lift the system.
3. Tilt the system into position over the fixed rack rails.
4. Carefully lower the system until the rear of the system rests on the rails.
5. While one person is supporting the weight of the system, have the second person move to the front of
the system and push the system all the way into the rack.
6. Using your labels, reconnect the cables at the rear of the system unit.
7. For a water-cooled system, connect the water hoses at the rear of the rack to the manifold, as shown
in the following figure.
Ensure that you plug the male hose into the female manifold plug, and plug the female hose into the
male manifold plug.
Attention: Before powering on the system, ensure that cooling water is circulating through the
system.
Installing and configuring the 8335-GTX 105
Summary of Contents for Power System AC922
Page 4: ...iv...
Page 105: ...or or or or Installing and configuring the 8335 GTX 91...
Page 137: ......
Page 138: ...IBM...