Figure 35. Removing the processor socket screws from the bottom of the chassis
7. Remove the drive signal and drive power cables from the system backplane.
For instructions, see “Removing the disk drive backplane from the 9006-12P system” on page 15.
Carefully pull them through the fan bulkhead to the front of the system.
8. Remove the operator panel cable from the system backplane as shown in Figure 36 on page 42.
Removing and replacing parts in the 9006-12P system 41
Summary of Contents for Power System LC921 9006-12P
Page 1: ...Power Systems Servicing the IBM Power System LC921 9006 12P IBM...
Page 14: ...xiv Power Systems Servicing the IBM Power System LC921 9006 12P...
Page 118: ...104 Power Systems Servicing the IBM Power System LC921 9006 12P...
Page 120: ...106 Power Systems Servicing the IBM Power System LC921 9006 12P...
Page 131: ......
Page 132: ...IBM...