Figure 78. Replacing and securing the cover
3. Replace the two cover screws (2) at the rear of the cover.
Service and operating positions for 9006-12P
Learn how to place an IBM Power System LC921 (9006-12P) system into the service or operating
position.
Placing an 9006-12P system into the service position
Learn how to place an IBM Power System LC921 (9006-12P) system into the service position.
Before you begin
The systems must be removed from the rails for servicing.
98 Power Systems: Servicing the IBM Power System LC921 (9006-12P)
Summary of Contents for Power System LC921 9006-12P
Page 1: ...Power Systems Servicing the IBM Power System LC921 9006 12P IBM...
Page 14: ...xiv Power Systems Servicing the IBM Power System LC921 9006 12P...
Page 118: ...104 Power Systems Servicing the IBM Power System LC921 9006 12P...
Page 120: ...106 Power Systems Servicing the IBM Power System LC921 9006 12P...
Page 131: ......
Page 132: ...IBM...