4.
Determine to place the system in the rack. Record the EIA location.
5.
Facing the front of the rack and working from the right side, use tape, a marker, or pencil to mark
the lower hole of each EIA unit.
6.
Repeat step 5 for the corresponding holes located on the left side of the rack.
7.
Go to the rear of the rack.
8.
On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of
the rack.
9.
Mark the bottom EIA unit.
10.
Mark the corresponding holes on the left side of the rack.
Attaching the rails to the system chassis and to the rack
You must install the rails onto the chassis and into the rack. Use this procedure to perform this task.
Figure 1. Removing the filler panels
Installing and configuring the system
3
Summary of Contents for Power System S821LC
Page 1: ...Power Systems Installing the IBM Power System S821LC 8001 12C IBM...
Page 2: ......
Page 3: ...Power Systems Installing the IBM Power System S821LC 8001 12C IBM...
Page 16: ...xiv Power Systems Installing the IBM Power System S821LC 8001 12C...
Page 117: ...Figure 62 Connecting the power cords to the system Installing and configuring the system 101...
Page 118: ...102 Power Systems Installing the IBM Power System S821LC 8001 12C...
Page 130: ...114 Power Systems Installing the IBM Power System S821LC 8001 12C...
Page 131: ......
Page 132: ...IBM Printed in USA...