4.
Record the EIA location.
Note:
An EIA unit on your rack consists of a grouping of three holes.
5.
Facing the front of the rack and working from the right side, use tape, a marker, or pencil to mark
the lower hole of each EIA unit.
6.
Repeat step 5 for the corresponding holes located on the left side of the rack.
7.
Go to the rear of the rack.
8.
On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of
the rack.
9.
Place a self-adhesive dot at the bottom EIA unit.
10.
Mark the corresponding holes on the left side of the rack.
Figure 1. Removing the filler panels
Installing the IBM Power System S824 (8286-42A)
3
Summary of Contents for Power System S824
Page 1: ...Power Systems Installing the IBM Power System S824 8286 42A GI11 9905 06 IBM...
Page 2: ......
Page 3: ...Power Systems Installing the IBM Power System S824 8286 42A GI11 9905 06 IBM...
Page 6: ...iv Power Systems Installing the IBM Power System S824 8286 42A...
Page 16: ...xiv Power Systems Installing the IBM Power System S824 8286 42A...
Page 50: ...34 Power Systems Installing the IBM Power System S824 8286 42A...
Page 62: ...46 Power Systems Installing the IBM Power System S824 8286 42A...
Page 63: ......
Page 64: ...IBM Part Number 01LK523 Printed in USA GI11 9905 06 1P P N 01LK523...