Figure 56. Inserting a memory riser filler
5. Repeat steps “2” on page 75 - “4” on page 76 for each memory riser that you want to remove.
Preparing the 9040-MR9 system for operation after permanently removing a memory
riser
To prepare the system for operation after you permanently remove a memory riser, complete the steps in
this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
a) Lower the cover (A) onto the system unit. Ensure that the cover alignment pins (C) on each side of
the cover fit into the matching slots in the chassis.
b) Slide the cover (A) onto the system unit. Ensure that the tabs (D) tuck under the mesh along the
front opening of the chassis.
c) Close the release latches (B) by pushing it in the direction that is shown in the following figure.
Memory riser for the 9040-MR9 77
Summary of Contents for Power System System E950
Page 1: ...Power Systems Memory modules for the 9040 MR9 IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Power Systems Memory...
Page 17: ...Figure 1 Removing the power cords L003 or or Memory modules for the 9040 MR9 3...
Page 30: ...or or or or 16 Power Systems Power Systems Memory...
Page 46: ...Figure 23 Removing the power cords L003 or or 32 Power Systems Power Systems Memory...
Page 59: ...Figure 32 Removing the power cords L003 or or Memory riser for the 9040 MR9 45...
Page 70: ...Figure 40 Removing the power cords L003 or or 56 Power Systems Power Systems Memory...
Page 86: ...or or or or 72 Power Systems Power Systems Memory...
Page 105: ......
Page 106: ...IBM...