3.
Install the retention screw on each system chassis slide rail to further attach the slide rail to the
system chassis.
4.
Next, install the rack slide rails into the rack. Each rack slide rail is marked with either an R (right) or
an L (left), when you look from the front. Select the right slide rail, bring it to the front of the rack,
and locate the selected EIA unit.
5.
From the front of the rack, insert the pins on the front of the slide rail (1) into the holes on the front
of the rack that you previously marked (2). Pull the rail forward so that the rail spring clip (3) latches
Figure 3. Attaching the left system chassis slide rail to the system chassis
Figure 4. Attaching the left system chassis rail retention screw to the system chassis
6
Installing the System and Ordered Parts for the 8348-21C
Summary of Contents for Power Systems S812LC 8348-21C
Page 2: ......
Page 6: ...iv Installing the System and Ordered Parts for the 8348 21C...
Page 16: ...xiv Installing the System and Ordered Parts for the 8348 21C...
Page 76: ...or or 1 2 3 4 or 1 2 3 4 or 60 Installing the System and Ordered Parts for the 8348 21C...
Page 88: ...72 Installing the System and Ordered Parts for the 8348 21C...
Page 108: ...92 Installing the System and Ordered Parts for the 8348 21C...
Page 109: ......
Page 110: ...IBM Printed in USA...