Appendix
F.
Securing
the
Rack
This
appendix
contains
information
about
installing
the
rack
for
the
system.
This
procedure
should
be
performed
if
the
customer
has
ordered
the
appropriate
hardware
kits
to
bolt
the
system
to
the
floor.
For
further
information,
refer
to
part
number
44P2659
and
the
installation
instructions
for
the
frame
tie-down
(part
number
44P2660).
Additional
information
about
planning
the
site
for
installing
the
system
is
described
in
Site
and
Hardware
Planning
Information
.
Position
the
Rack
Note:
The
customer
should
unpack
the
rack
and
position
it
in
the
room.
If
this
has
not
been
done,
consult
the
customer
and
the
marketing
representative
as
necessary.
To
unpack
and
position
the
rack,
do
the
following:
1.
Remove
all
packing
and
tape
from
the
rack.
2.
Position
the
rack
according
to
the
customer
floor
plan.
Note:
System
configurations
weighing
more
than
1134
kg
(2500
lbs)
have
a
weight
distribution
plate
kit
(part
number
44P3327)
shipped
with
the
system.
Refer
to
the
installation
instructions
contained
in
the
kit.
For
a
raised-floor
installation
only,
when
it
is
at
its
installation
location,
the
stabilizer
bar
(part
number
44P2996)
replaces
the
weight
distribution
plate
(part
number
11P3528).
3.
Lock
each
caster
wheel.
4.
While
moving
the
system
rack
to
its
installation
location,
protect
floor
panels
from
damage
by
covering
the
panels
with
a
rigid
protective
sheet
material.
Notes:
a.
Ensure
that
the
protective
material
is
placed
at
the
floor
panels
immediately
adjacent
to
the
final
installation
location.
b.
Ensure
that
all
power
is
disconnected
to
the
system.
Determine
Your
Next
Step
Use
the
following
to
determine
your
next
step:
v
If
you
are
installing
the
ruggedized
frame
kit,
go
to
“Install
the
Ruggedized
Frame
Kit”
on
page
142.
v
If
the
rack
is
being
attached
to
a
concrete
(non-raised)
floor,
go
to
“Attach
the
Rack
to
a
Concrete
(Non-Raised)
Floor”
on
page
144.
v
If
the
rack
is
being
attached
to
a
raised
floor,
go
to
“Attach
the
Rack
to
a
Low-Raised
or
High-Raised
Floor”
on
page
146.
v
If
the
rack
is
not
being
attached
to
the
floor,
go
to
“Step
6.
Position
and
Level
the
Rack”
on
page
11.
141
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...