Attach
the
Rack
to
a
Concrete
(Non-Raised)
Floor
Attention:
It
is
the
customer’s
responsibility
to
ensure
the
following
steps
are
completed
before
the
service
representative
performs
the
tie-down
procedure.
Note:
The
customer
should
obtain
the
service
of
a
qualified
structural
engineer
to
determine
appropriate
anchoring
of
the
mounting
plates.
A
minimum
of
five
anchor
bolts
for
each
mounting
plate
must
be
used
to
secure
the
plates
to
the
concrete
floor.
Four
bolts
are
required
on
opposite
sides
and
opposite
ends
of
each
mounting
plate.
One
bolt
is
required
in
the
center
hole
of
each
plate.
See
the
following
illustration
for
positioning
the
mounting
plates.
1
22.5
mm
6
Mounting
Plate
11
(2X)
2.9
mm
2
1019
mm
7
Caster
12
750
mm
REF
3
27.5
mm
8
1070
mm
REF
13
20.1
mm
4
(10X)
65.5
mm
9
Rack
5
709
mm
10
(4X)
1/2
x
13
UNC
REF
For
details
on
installing
the
mounting
plate,
the
customer
should
refer
to
the
Site
and
Hardware
Planning
Information
.
1.
Place
the
top
isolator
plastic
bushings
inside
the
leveling
feet
with
thick
washers
and
spacers
under
the
top
plastic
bushings.
144
Eserver
pSeries
655
Installation
Guide
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...