4.
If
the
nodes
require
I/O
cables,
route
them
to
the
appropriate
nodes
and
connect
each
cable
v
Make
certain
the
I/O
cables
do
not
interfere
with
the
SNI
ports
5.
Wire
tie
the
I/O
cables
into
a
bundle
running
down
the
left
side
of
the
frame
6.
Clamp
the
I/O
cables
into
the
tailgate
using
tailgate
inserts
v
Depending
on
the
number
and
size
of
the
I/O
cables,
you
may
have
to
use
one
or
two
tailgate
slots
and
clamping
inserts
7.
Sort
the
switch
cables
into
groups
based
on
node
and
SNI
port
location,
but
do
not
clamp
or
connect
the
switch
cables
until
instructed
to
do
so.
A
simplified
description
of
the
next
few
steps
is
as
follows:
a.
Switch
cables
will
be
clamped
into
the
tailgate
in
groups
of
either
four
or
two
b.
Nodes
in
frame
slots
8
and
7
will
be
cabled
first
and
clamped
into
tailgate
slot
2,
3,
or
4
depending
on
the
number
of
I/O
cables
used
in
the
frame
c.
Switch
cables
for
nodes
in
frame
slots
6
and
5
get
clamped
into
the
next
available
tailgate
slot
d.
Continue
this
cable
pattern
working
down
the
frame
and
clamping
to
the
right
in
the
tailgate
8.
Without
plugging
the
switch
cables
into
the
SNI
ports,
take
the
switch
cables
for
the
node
in
frame
slot
8
and
raise
them
into
position
a.
Check
the
cable
labels
and
verify
that
you
have
the
correct
cables
for
each
SNI
port
b.
Make
certain
that
the
cable
for
the
upper
SNI
port
extends
further
than
the
cable
for
the
lower
SNI
port
c.
Place
the
wire
tie
far
enough
down
the
cable
set
so
that
the
cables
will
have
sufficient
length
for
a
gentle
bend
radius
d.
Wire
tie
the
cables
together
9.
Insert
a
wire
tie
into
the
tie
base
on
the
node
shelf
for
frame
slot
6
and
loosely
cinch
the
wire
tie
around
the
switch
cables
for
frame
slot
8
10.
Let
the
switch
cables
for
the
node
in
frame
slot
8
hang
from
the
wire
tie
11.
Repeat
step
8
for
the
node
in
frame
slot
7
12.
Insert
a
wire
tie
into
the
tie
base
on
the
node
shelf
for
frame
slot
5
and
loosely
cinch
the
wire
tie
around
the
switch
cables
for
frame
slot
7
13.
Let
the
switch
cables
for
the
node
in
frame
slot
7
hang
from
the
wire
tie
14.
Clamp
the
switch
cables
for
the
nodes
in
frame
slot
8
and
7
into
the
tailgate
using
a
rubber-faced,
tailgate
insert
with
the
appropriate
thickness
of
rubber
(refer
to
Figure
4)
15.
Lift
the
switch
cables
for
node
in
frame
slot
8
and
tighten
the
wire
tie
onto
the
tie
base
16.
Connect
the
switch
cables
to
the
SNI
ports
on
the
node
in
frame
slot
8
17.
Lift
the
switch
cables
for
node
in
frame
slot
7
and
tighten
the
wire
tie
onto
the
tie
base
18.
Connect
the
switch
cables
to
the
SNI
ports
on
the
node
in
frame
slot
7
19.
Repeat
steps
8
through
13
for
the
nodes
in
frame
slots
6
and
5
Figure
4.
Cable
management
bracket
with
cables
installed
Appendix
H.
LAN
and
Switch
Cable
Installation
and
Management
Procedures
165
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...