Before
starting
this
part
of
the
procedure:
v
Be
aware
that
this
part
of
the
procedure
applies
to
nodes
located
on
the
right
side
of
the
frame
(
as
viewed
from
the
rear
)
and
must
be
performed
after
you
cable
the
left
side
of
the
frame
v
Make
certain
that
all
cables
for
the
nodes
on
the
left
side
of
the
frame
are
properly
fastened
to
the
nodes
v
Verify
that
all
HMC,
Ethernet,
I/O,
and
switch
cables
for
the
nodes
on
the
right
side
of
the
frame
are
inside
the
tailgate
v
If
I/O
cables
are
not
installed
and
you
want
to
locate
switch
cables
closer
to
the
right
side
of
the
tailgate,
you
will
need
to
use
foam
block
tailgate
inserts
Figure
5.
Cable
layout
for
nodes
on
the
right
side
of
the
frame
Appendix
H.
LAN
and
Switch
Cable
Installation
and
Management
Procedures
167
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...