After
the
last
tailgate
insert
(the
one
clamping
the
cables
for
the
left
side
of
the
frame),
install
one
or
more
foam
block
tailgate
inserts
into
the
open
slots
(refer
to
Figure
6
on
page
170)
Note:
Do
not
connect
any
switch
cables
to
the
nodes
until
instructed
to
do
so.
After
the
preliminary
steps
are
complete
for
cabling
the
right
side
of
the
frame:
1.
Sort
the
switch
cables
into
groups
based
on
node
and
SNI
port
location,
but
do
not
clamp
or
connect
cables
until
instructed
to
do
so.
An
overview
of
the
next
few
steps
is
as
follows:
a.
Switch
cables
will
be
clamped
into
the
tailgate
in
groups
of
either
four
or
two
b.
The
nodes
in
frame
slots
8
and
7
will
be
cabled
first
and
clamped
into
tailgate
slot
8,
9,
or
10
v
The
tailgate
slot
number
is
dependent
on
the
number
of
I/O
cables
or
foam
block
tailgate
inserts
used
c.
Switch
cables
for
nodes
in
frame
slots
6
and
5
get
clamped
into
the
next
available
tailgate
slot
d.
Continue
this
cable
pattern
working
down
the
frame
and
clamping
to
the
right
in
the
tailgate
2.
Before
routing
the
switch
cables,
position
the
HMC,
Ethernet,
and
I/O
cables
but
do
not
clamp
these
cables
into
the
tailgate
until
instructed
to
do
so
a.
Route
the
HMC
and
Ethernet
cables
to
the
appropriate
nodes
and
connect
each
cable
v
Make
certain
the
HMC
and
Ethernet
cables
do
not
interfere
with
the
SNI
ports
b.
Wire
tie
the
HMC
and
Ethernet
cables
into
a
bundle
running
down
the
right
side
of
the
frame
c.
If
the
nodes
require
I/O
cables,
route
them
to
the
appropriate
nodes
and
connect
each
cable
v
Make
certain
the
I/O
cables
do
not
interfere
with
the
SNI
ports
d.
Wire
tie
the
I/O
cables
into
a
bundle
running
down
the
right
side
of
the
frame
3.
Without
plugging
the
switch
cables
into
the
SNI
ports,
take
the
switch
cables
for
the
node
in
frame
slot
8
and
raise
them
into
position
a.
Check
the
cable
labels
and
verify
that
you
have
the
correct
cables
for
each
SNI
port
b.
Make
certain
that
the
cable
for
the
upper
SNI
port
extends
further
than
the
cable
for
the
lower
SNI
port
c.
Place
the
wire
tie
far
enough
down
the
cable
set
so
that
the
cables
will
have
sufficient
length
for
a
gentle
bend
radius
d.
Wire
tie
the
cables
together
4.
Insert
a
wire
tie
into
the
tie
base
on
the
node
shelf
for
frame
slot
6
and
loosely
cinch
the
wire
tie
around
the
switch
cables
for
frame
slot
8
5.
Let
the
switch
cables
for
the
node
in
frame
slot
8
hang
from
the
wire
tie
6.
Repeat
step
8
for
the
node
in
frame
slot
7
7.
Insert
a
wire
tie
into
the
tie
base
on
the
node
shelf
for
frame
slot
5
and
loosely
cinch
the
wire
tie
around
the
switch
cables
for
frame
slot
7
8.
Let
the
switch
cables
for
the
node
in
frame
slot
7
hang
from
the
wire
tie
9.
Clamp
the
switch
cables
for
the
nodes
in
frame
slot
8
and
7
into
the
tailgate
using
a
rubber-faced,
tailgate
insert
with
the
appropriate
thickness
of
rubber
(refer
to
Figure
4
on
page
165)
10.
Lift
the
switch
cables
for
node
in
frame
slot
8
and
tighten
the
wire
tie
onto
the
tie
base
11.
Connect
the
switch
cables
to
the
SNI
ports
on
the
node
in
frame
slot
8
12.
Lift
the
switch
cables
for
node
in
frame
slot
7
and
tighten
the
wire
tie
onto
the
tie
base
13.
Connect
the
switch
cables
to
the
SNI
ports
on
the
node
in
frame
slot
7
14.
Repeat
steps
8
through
13
for
the
nodes
in
frame
slots
6
and
5
v
The
wire
tie
for
the
node
in
frame
slot
6
uses
the
tie
base
mounted
on
the
node
shelf
for
frame
slot
4
v
The
wire
tie
for
the
node
in
frame
slot
5
uses
the
tie
base
mounted
on
the
node
shelf
for
frame
slot
3
15.
Clamp
the
switch
cables
for
the
nodes
in
frame
slot
6
and
5
into
the
next
available
tailgate
slot
using
a
rubber-faced,
tailgate
insert
with
the
appropriate
thickness
of
rubber
16.
Repeat
steps
15
through
18
for
the
nodes
in
frame
slots
6
and
5
168
Eserver
pSeries
655
Installation
Guide
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...