Chapter
2.
Installing
the
pSeries
655
DANGER
This
system
has
redundant
power
supply
capabilities,
meaning
that
it
has
the
ability
to
have
two
power
supplies
running
simultaneously
in
the
same
system
unit.
When
instructed
to
disconnect
the
power
source,
ensure
that
all
power
cables
have
been
unplugged.
D07
Server
handling
and
packaging
information
This
section
applies
to
the
following
server
machine
types
and
models:
v
pSeries
655
v
pSeries
670
v
pSeries
690
v
369/55
v
406/70
v
406/70
v
9118
v
9119
DANGER
Because
of
the
size
and
weight
of
this
product,
the
installation,
relocation,
or
discontinuance
packaging
and
unpackaging
of
this
server
must
be
performed
by
professional
movers
who
are
trained
to
avoid
the
hazards
associated
with
moving
large
heavy
objects.
When
the
server
is
delivered
to
a
customer
location,
the
professional
mover
must
unpack
the
server
from
the
shipping
crate,
move
the
server
to
the
installation
location,
install
any
weight
distribution
plates,
if
provided,
and
remove
the
shipping
crate.
The
shipping
crate
is
then
returned
to
the
shipper.
Do
not
remove
the
shipping
bag
from
around
the
server
for
48
hours,
even
if
the
server
was
shipped
in
a
climate-controlled
truck.
This
action
allows
the
server
to
acclimate
to
its
environment.
If
the
customer
is
not
ready
for
the
professional
mover
to
perform
the
installation,
relocation,
or
discontinuance
procedures,
it
then
becomes
the
customer’s
responsibility
to
contact
the
professional
mover,
so
that
the
professional
mover
can
return
and
complete
the
unpacking
of
the
server.
The
customer
is
responsible
for
any
additional
charges
this
might
incur.
Before
this
server
is
relocated
or
discontinued,
it
must
be
properly
packaged
in
the
approved
packing
material.
This
action
ensures
the
safe
handling
and
the
protection
of
the
server.
The
authorized
service
provider
is
responsible
for
ordering
the
appropriate
packing
material.
A
list
of
appropriate
packing
material
is
located
at
the
following
IBM
internal
Web
site:
http://cssweb1.atlanta.ibm.com/ssrhomepage/packingsealing.html.
Relocation
and
discontinuance
activity
is
usually
billable,
and
the
cost
of
the
packing
material
must
be
included
in
the
contract.
Customer
Responsibility
for
Site
Preparation
Attention:
Before
installing
the
system,
refer
to
the
Site
and
Hardware
Planning
Information
.
Observe
the
requirements
in
the
Site
and
Hardware
Planning
Information
relating
to
system
weight,
noise
emissions,
power,
and
cooling.
7
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...