v
Service
Tool
(used
for
performing
service
procedures
on
a
processor
subsystem)
Verify
with
the
customer
that
the
following
items
are
available.
You
will
need
them
to
complete
this
installation.
v
A
floor
plan,
showing
where
to
place
each
rack
v
The
items
necessary
for
installing
a
modem,
including
the
correct
telephone
jack,
line
cords,
cables,
and
a
power
source
Note:
These
items
are
not
necessary
if
there
is
an
existing
system
that
has
an
HMC
managing
the
system
resources.
For
information
on
the
HMC
inventory,
refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
.
Rack
Inventory
v
Front
and
rear
door
for
the
rack
v
Two
power
cords
v
Display(s)
and
keyboard
for
the
Hardware
Management
Console
for
pSeries
(if
an
existing
HMC
is
not
already
installed
and
available
for
the
system
being
installed).
Hardware
Management
Console
(If
Not
Installed)
v
Hardware
Management
Console
(HMC).
One
HMC
is
standard;
a
second
HMC
is
optional.
v
Power
cords
v
Display
and
keyboard
Asynchronous
Adapters
v
8-port
asynchronous
adapters
are
required
for
the
HMC.
One
adapter
is
required
for
each
HMC
being
installed.
The
8-port
asynchronous
adapter
connects
the
HMC
to
the
Bulk
Power
Controllers
(BPCs)
through
its
connector
box.
v
128-port
asynchronous
adapters
can
be
installed
depending
upon
the
system
configuration
and
the
number
of
processor
subsystems
being
installed.
Numerous
processor
subsystems
can
be
connected
to
the
HMCs
through
128-port
asynchronous
adapters
and
RANs.
Tool
Kits
The
following
tool
kits
are
shipped
with
the
system:
v
Processor
subsystem
tools
(part
number
44P1461,
MFI
00P4635)
v
I/O
subsystem
tools
(part
number
44P2629,
MFI
00P4652)
Ensure
that
these
tools
are
placed
in
the
rack
toolbox
located
at
the
bottom
front
of
the
rack.
Step
6.
Position
and
Level
the
Rack
To
adjust
the
leveler
feet
on
the
rack,
do
the
following:
1.
Ensure
the
rack
is
positioned
according
to
the
customer
plan.
2.
Loosen
the
jam
nut
on
each
leveler
foot
by
turning
the
nut
counterclockwise
(away
from
the
bottom
of
the
rack).
3.
Rotate
each
leveler
foot
downward
until
it
contacts
the
surface
on
which
the
rack
is
placed.
4.
Adjust
the
leveler
feet
downward
as
needed
until
the
rack
is
level.
When
the
rack
is
level,
tighten
the
jam
nuts
against
the
base
by
turning
the
nut
clockwise
(toward
the
bottom
of
the
rack).
Chapter
2.
Installing
the
pSeries
655
11
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...