Step
18.
Have
the
Customer
Activate
the
Designated
Circuit
Breakers
Have
the
customer
activate
the
designated
circuit
breakers
by
doing
the
following:
1.
Ensure
that
the
tag
S229-0237,
which
reads
“Do
Not
Operate,”
has
been
removed.
2.
Reset
the
circuit
breaker.
Note:
The
following
steps
should
be
performed
only
by
the
service
representative.
3.
Turn
the
UEPO
switch
to
the
ON
position.
4.
Verify
that
the
LEDs
on
the
bulk
power
enclosure
are
on.
The
labels
on
the
LEDs
are
as
follows:
v
BPC
-
good
v
BPD
-
good
v
Power
v
Complete
v
Standby
(flashes,
then
lights
on
solid)
v
BPR
enabled
v
Power-in
on
processor
subsystem(s)
Step
19.
Power
on
the
HMC
Attention:
Ensure
that
all
subsystems
are
correctly
installed
and
cabled
before
performing
this
step.
To
power
on
the
HMC,
refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
for
instructions.
Ensure
that
the
I/O
subsystems
are
correctly
installed
and
cabled
before
performing
this
step.
At
HMC
power
on,
the
HMC
performs
an
initialization
to
determine
a
frame’s
managed
systems
and
resources.
Note:
If
either
an
8-port
or
128-port
asynchronous
adapter
is
installed,
the
adapters
must
be
configured
before
the
HMC
can
inventory
the
managed
systems.
See
“Configure
Ports
on
the
8-Port
Asynchronous
Adapter”
on
page
25
and
“Install
and
Configure
an
128-Port
Asynchronous
Adapter”
on
page
25.
The
rack
(frame)
may
contain
combinations
of
processor
subsystems,
I/O
subsystems,
and
IBFs.
For
details
of
this
initialization,
refer
to
″
Initializing
a
Frame’s
Managed
Systems
and
Resources
″
in
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
.
Step
20.
Verify
HMC
Code
Level
The
customer
is
responsible
for
verifying
that
the
required
code
level
is
installed
on
the
HMC.
To
verify
the
HMC
code
level,
refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
for
instructions.
1.
Select
Help
on
the
HMC
interface.
2.
Select
About
Hardware
Management
Console
.
The
code
level
installed
on
the
HMC
is
displayed.
Note:
The
code
level
must
be
Release
3.1.2
or
later.
3.
If
the
code
level
is
not
Release
3.1.2
or
later,
the
customer
should
call
their
service
representative
for
instructions
on
how
to
obtain
the
required
code
level.
Chapter
2.
Installing
the
pSeries
655
27
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...