Step
21.
Set
the
Console’s
Date
and
Time
At
the
initial
installation
of
the
HMC,
the
date
and
time
must
be
set
on
the
HMC.
Instructions
for
setting
the
date
and
time
are
contained
in
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
.
The
battery-operated
clock
keeps
the
date
and
time
for
the
HMC.
You
may
also
need
to
set
the
console
date
and
time
under
the
following
circumstances:
v
If
the
battery
is
replaced
in
the
HMC
v
If
your
system
is
physically
moved
to
a
different
time
zone
Step
22.
Verify
Installation
is
Complete
Using
the
HMC
Interface
Use
the
HMC
basic
system
management
tasks
to
verify
that
the
installation
is
successful
and
complete.
The
tasks
may
be
used
to
power
the
system
on
or
off,
view
managed
systems
properties,
and
other
functions.
For
detailed
procedures
on
using
the
basic
management
tasks,
refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
.
Step
23.
Determine
Firmware
and
Microcode
Levels
Ensure
that
the
latest
firmware
and
microcode
levels
are
installed
on
the
system.
The
following
firmware
and
microcode
should
be
brought
to
the
latest
level:
v
System
firmware
v
Frame
(power
subsystem)
firmware
v
Integrated
SCSI
controller
microcode
v
Integrated
Ethernet
microcode
Note:
The
integrated
SCSI
controller
and
integrated
Ethernet
microcode
can
only
be
verified
after
the
operating
system
is
installed.
To
determine
the
current
level
of
firmware
and
microcode,
and
how
to
perform
updates,
go
to
Processor
Subsystem
Firmware
Updates
in
the
Eserver
pSeries
655
User’s
Guide
.
Step
24.
Installing
the
Operating
System
If
an
operating
system
has
been
preinstalled
on
your
system,
see
the
documentation
provided
with
the
operating
system.
If
you
are
installing
the
AIX
operating
system
at
this
time,
AIX
can
be
installed
from
a
Network
Installation
Management
(NIM)
server.
For
information
about
installing
AIX
from
a
NIM
server,
see
the
AIX
Installation
Guide
and
Reference
.
When
installation
of
AIX
is
completed,
return
to
this
step.
Step
25.
Verify
Basic
Hardware
and
Operating
System
Operation
Verify
the
basic
hardware
and
operating
system
operation
by
running
the
online
diagnostics
in
the
service
mode
as
described
in
“Running
Online
Diagnostics
in
Service
Mode”
on
page
34.
Step
26.
Install
the
Rack
Doors
This
step
describes
how
to
install
the
doors
on
the
system
rack.
For
more
information
about
the
doors,
see
“Step
2.
Check
the
Prerequisites
to
Installing
the
System”
on
page
8.
28
Eserver
pSeries
655
Installation
Guide
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...