d.
Adjust
the
sliding
part
of
the
lift
plate
so
that
it
can
move
forward
and
away
from
the
rack.
Note:
The
sliding
part
of
the
lift
plate
can
be
positioned
to
move
in
two
directions.
e.
Pull
the
release
buttons
on
the
lift
plate
and
slide
the
lift-plate
tray
to
the
maximum
distance
away
from
the
rack.
f.
Carefully
slide
the
processor
subsystem
out
of
the
frame
cage
until
the
front
of
the
processor
subsystem
is
aligned
with
the
edge
of
the
lift-plate
tray
the
is
farthest
from
the
rack.
g.
Check
to
ensure
that
the
rear
of
the
processor
subsystem
and
the
PCI
adapter
release
handles
are
clear
of
the
rack
and
frame
cage.
h.
Tie
the
processor
subsystem
to
the
lift
plate
with
tie-down
straps.
i.
Check
to
ensure
that
you
can
safely
lower
the
lift
plate.
If
the
processor
subystem
will
clear
the
frame
cage
and
rack,
lower
the
lift
plate
and
release
the
lift-tool
brake.
If
you
cannot
safely
lower
the
lift
plate,
do
the
following:
1)
Remove
the
wheel
chocks
on
the
lift-tool
casters,
and
disengage
the
lift-tool
brake.
2)
Move
the
lift
tool
away
from
the
rack
until
you
can
safely
lower
the
lift
plate.
3)
Install
the
wheel
chocks,
and
engage
the
brake
on
the
lift
tool.
4)
Lower
the
lift
plate
and
release
the
lift-tool
brake.
j.
Remove
the
processor
subsystem
from
the
lift
plate.
9.
If
other
processor
subsystems
are
not
being
removed
from
the
rack,
repackage
the
lift
tool.
I/O
Subsystems
This
section
describes
how
to
install
and
remove
I/O
subsystems.
I/O
Subsystem
Installation
CAUTION:
This
unit
weighs
between
32
kg
(70.5
pounds)
and
55
kg
(121.2
pounds).
Three
persons
are
required
to
safely
move
it.
Using
less
than
three
persons
to
move
it
can
result
in
injury.
C05
Attention:
Installing
an
I/O
subsystem
in
the
rack
requires
the
use
of
a
lift
tool.
This
procedure
requires:
v
The
use
of
a
lift
tool
(part
number
09P2481)
and
lift-plate
assembly
tool
(part
number
11P4369).
v
The
lift
tool
wheels
must
be
chocked
to
prevent
it
from
moving
during
the
operation.
The
rack
must
not
be
on
its
casters.
The
leveling
pads
must
be
engaged
to
prevent
the
rack
from
moving
during
the
operation.
To
install
an
I/O
subsystem
in
the
rack,
do
the
following:
1.
Unpack
the
lift
tool
and
follow
the
assembly
instructions
included
with
the
tool.
2.
Inspect
the
tool
for
damage
(do
not
perform
the
installation
procedure
with
a
damaged
lift
tool).
3.
Read
all
safety
instructions
before
performing
this
operation.
4.
Replace
the
blue
lift
plate
with
the
orange
lift
plate
(part
number
11P4369).
5.
Orient
the
two
round
holes
in
the
lift
plate
to
the
side
of
the
lift
tool
that
will
be
closest
to
the
frame.
6.
Position
the
lift
tool
so
that
the
I/O
subsystem
can
be
moved
onto
the
lift
plate.
7.
Install
the
wheel
chocks,
and
engage
the
brake
on
the
lift
tool.
8.
Move
the
I/O
subsystem
onto
the
tool
with
the
rear
side
toward
the
two
holes
of
the
lift
plate.
The
side
with
the
handles
is
considered
the
front
side.
Note:
Ensure
that
the
I/O
subsystem
is
in
the
center
of
the
lift
plate.
9.
Remove
the
wheel
chocks
on
the
lift-tool
casters,
and
disengage
the
lift-tool
brake.
Chapter
4.
Installation
and
Removal
Procedures
45
Summary of Contents for pseries 655
Page 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 2: ......
Page 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Page 14: ...xii Eserver pSeries 655 Installation Guide...
Page 22: ...6 Eserver pSeries 655 Installation Guide...
Page 54: ...38 Eserver pSeries 655 Installation Guide...
Page 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Page 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Page 128: ...112 Eserver pSeries 655 Installation Guide...
Page 132: ...116 Eserver pSeries 655 Installation Guide...
Page 156: ...140 Eserver pSeries 655 Installation Guide...
Page 204: ...188 Eserver pSeries 655 Installation Guide...
Page 211: ......
Page 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...