B. Create storage resources (Section 8.1.2:
Creating Storage Resources
on page 234)
4. Create additional HPSS Users (Section 13.1.1:
Adding HPSS Users
on page 325)
5. Create Filesets and Junctions (Section 10.1:
Filesets & Junctions List
on page 308 and Section
10.5:
Creating a Junction
on page 315)
6. Create HPSS /log Directory
If log archiving is enabled, using an HPSS namespace tool such as scrub or ftp, create the /log
directory in HPSS. This directory must be owned by hpsslog and have permissions rwxr-xr-x.
The /log directory can be created by the root user using ftp as follows:
% ftp <node> <HPSS Port> # login as root user
ftp> mkdir /log
ftp> quote site chown hpsslog /log
ftp> quote site chmod 755 /log
1.5. Additional Configuration Roadmap (All Sites)
This section provides a high level roadmap for additional HPSS configuration.
1. Configure HPSS User Interfaces (Chapter 14:
User Interfaces
on page 339)
2. Set up Backup for DB2 and Other Infrastructure (Chapter 15:
Backup and Recovery
on page 356)
3. Set up High Availability, if desired (
HPSS Installation Guide
, Chapter 3:
HPSS Planning
)
4. Optionally configure support for both authentication mechanisms (
HPSS Installation Guide
,
Section 5.9:
Supporting Both Unix and Kerberos Authentication for SSM
)
1.6. Verification Checklists (All Sites)
This section provides a number of checklists regarding configuration, operational and performance
issues.
1.6.1. Configuration Checklists
After HPSS is running, the administrator should use the following checklists to verify that HPSS was
configured or converted correctly:
Global Configuration
•
Verify that a
Default Class of Service
has been selected.
•
Verify that a
Root Core Server
has been selected.
Storage Subsystem Configuration
•
Verify that a
Default Class of Service
has been selected if desired.
•
Verify that a
Gatekeeper
has been selected if gatekeeping or account validation is required.
•
Verify that the
COS Name
list has been filled in correctly.
HPSS Management Guide
November 2009
Release 7.3 (Revision 1.0)
17
Summary of Contents for RELEASE 7.3
Page 14: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 14...
Page 195: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 195...
Page 210: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 210...
Page 215: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 215...
Page 222: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 222...
Page 266: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 266...
Page 293: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 293...
Page 367: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 367...
Page 372: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 372...
Page 384: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 384...
Page 388: ...HPSS Management Guide November 2009 Release 7 3 Revision 1 0 388...